48 Installation
(for qualified installers only)
© Travis Industries
4140627
100-01353
8. The stepper motor (adjustable regulator) has an installation sheet included with it – make sure to follow all of
the directions. Place the stepper motor on the gas control valve (see below) –
MAKE SURE IT IS
CORRECTLY ORIENTED
. Secure using the screws included with the motor – tighten to 25 Lb-inches. Leak
test this area after installation to verify proper installation.
9. Replace the burner.
Push the burner to the left side to insure the manifold inserts over the orifice.
10. Replace the remaining firebox components.
11. Replace the glass.
12. Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-test all
gas connections and the gas control valve.