![Travis Industries 4415 HO ST Installation Manual Download Page 35](http://html1.mh-extra.com/html/travis-industries/4415-ho-st/4415-ho-st_installation-manual_1154009035.webp)
Installation
(for qualified installers only)
35
© Travis Industries
4150624
100-01425
Do Not Drill or Screw Zone
When using screws to secure tile-board or other non-combustible to the front of the fireplace, make sure to avoid
the area shown below. Make sure screws penetrate no more than ½” (13mm) into the fireplace.
Do not drill screws into this shaded area.
Fireplace components are located in this area.
Maximum Screw Penetration = 1/2"
(long screws will hinder component access)