
Installing SNMP Management Board in 6-Port/12-Port 10BaseFL Hub
WARNING: DISCONNECT THE POWER CORD from the 6-Port or 12-
Port 10BaseFL hub before installing the SNMP Management Board.
Failure to observe this warning could result in personal injury or death
from electrical shock.
WARNING: AVOID CONTACT WITH POWER SUPPLY during Board
installation. Failure to observe this warning could result in personal
injury from electrical shock caused by capacitive discharge.
CAUTION: Wear a grounding device and observe electrostatic discharge
precautions when installing the SNMP Management board. Failure to
observe this caution could result in circuit board failure.
Tools:
Medium Phillips screwdriver
Small slotted screw driver
3/16-inch nut driver
To install the 6-Port or 12-Port 10BaseFL SNMP Management board:
1.
Place 6-Port or 12-Port 10BaseFL hub on table or other stable
surface.
2.
Using Phillips screwdriver, remove three (3) screws that
secure the cover to the 6-Port or 12-Port 10BaseFL hub left
side and three (3) screws that secure the cover to the 6-Port or
12-Port 10BaseFL hub right side.
3.
Using Phillips screwdriver, remove two (2) screws that secure
the cover to 6-Port or 12-Port 10BaseFL hub back.
4.
Using 3/16-inch nut driver, remove four (4) hex nuts that
secure the cover to the Cascade Connectors and two (2) hex
nuts that secure the cover to the serial port connector.
5-10
StackMaster™
4
5
3
2
2
4