44
8-2.
Operation Mode
and Control
Method
10) Night setback operation
A Night setback operation performs heating at 5K lower and cooling at 5K higher temperatures against the remote
controller set temperature from the setting start time (22:00) to the end time (6:00) every day.
Note)
• Set the remote controller time before starting a Night setback operation.
• The set time can be changed with remote controller FC. (See 10-8 (See page 122))
Related FC
11) Frost protection operation
A Frost protection operation performs heating at the set temperature RSC_F = 15 °C (FC).
1) How to operate
• Pressing the remote controller [
] button and then the [Frost protection] button starts a heating operation at the
set temperature of 15 °C.
• Pressing again the [Frost protection] button cancels the Frost protection operation.
• The remote controller displays "F" as the temperature during Frost protection.
• A set temperature change during a Frost protection operation cancels the operation.
2) Automatic stop of Frost protection operation
• The operation period of Frost protection can be set at FC 12 and 13 on the remote controller.
Longest period available: 20 days and 23 hours
• By entering the operation period (day and hour) at FC 12 and 13 on the remote controller and pressing the [Frost
protection] button, the operation period is set and the Frost protection operation will automatically be finished after
the period has passed.
• The operation period setting (day and hour) is stored in the memory.
Related FC
Item
Operation flow and applicable data, etc.
FC No.
Setting item
Default
Setting available range
Remote controller
OE
Night setback start Time setting
22:00
0:00-23:00
Remote controller
OF
Night setback end Time setting
6:00
0:00-23:00
26
Night setback setting Temperature width
5 degree
3 -20 degree
58
Night setback setting activate
0. Zone 1 & 2
1. Zone 1 only
FC No.
Setting item
Default
Setting available range
3A
Frost protection Yes / No
1: Yes
0: No
3B
Frost protection Set temperature
15 °C
10-20 °C
12 (Remote controller) FROST running period (days)
0
0-20 days
13 (Remote controller) FROST running period (hours)
0
0-23hours
Summary of Contents for HWS-P1105HR-E
Page 183: ...182 ...
Page 184: ...Copyright 2017 TOSHIBA CARRIER CORPORATION ALL Rights Reserved ...