167
4
Electric parts
replacement
2. Reactor
1) Perform the step 1-1.
2) Remove the reactor lead connected to the control
board.
Reactor lead connector A, B
3) Cut the binding tie that binds the compressor leads
and fan motor leads.
4) Remove the reactor.
(Truss B tight screw Ø4 × 6, 4 screw)
5) Attach a new reactor.
NOTE
Be sure to bind the removed binding tie by using the
commercially available binding tie.
Make sure that the fan motor lead and the reactor body
do not contact each other.
No.
Exchange parts
name
Work procedure
Remarks
Reactor body
Fan motor lead
Binding tie
(Compressor lead)
Binding tie
(Compressor lead,
Reactor lead)
Binding tie
(Fan motor lead,
Reactor lead,
Compressor lead)
Control board
Reactor lead
connector A
Summary of Contents for HWS-P1105HR-E
Page 183: ...182 ...
Page 184: ...Copyright 2017 TOSHIBA CARRIER CORPORATION ALL Rights Reserved ...