34
WATER DAY INTERVAL SCH A
01 Day (water every day)
1.
2.
Setting an Interval Day Schedule
Within the
Set Water Days
menu, turn the
Upper Line
knob to
view the following display:
Note:
The current day is the first active day of the
Interval
schedule.
For example, if today is
Saturday
and a
02
(every-other-day) Interval
is set, today is active. The next active watering day is
Monday
.
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Jan.
Feb.
March
April
May
June
July
Aug.
Sept.
Oct.
Nov.
Dec.
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Setting a Days-of-Week Schedule
Station #
Date
The chart below is provided to assist you in determining a weekly and
monthly watering day schedule prior to entering the information into
the station program. Make a copy of the table for each station that will
use a different
Set Days
schedule. All days are set as
active by default
,
to
exclude
from the schedule.
indicated by the
Y
in each box. Mark the box of each day that you want
The default
Water Day Interva
l is
01
which schedules every day
as active. To change the Interval number from
02 – 31
, turn the
Lower Line
kob.