11
Removing the Summer
Frame
Parts needed for this procedure:
2
Roller assembly
1
Left bracket
1
Right bracket
2
Bolt (3/8 x 2-1/4 inches)
2
Bolt (3/8 x 5/8 inch)
4
Flange nut (3/8 inch)
2
Clevis pin
2
Self-tapping screw (1/4 inch)
2
Hose plugs
Installing the Conversion Rollers
1.
Use a floor jack to lift the rear wheels off the
ground and support them with a jack stand.
2.
On machines that have a serial number less
than 312999999, install the vertical tube support
assembly to each rear corner of the deck frame
with a clevis pin and a self-tapping screw (1/4
inch) (
g024844
Figure 47
1.
Deck frame
3.
Clevis pin
2.
Self-tapping screw (1/4
inch)
4.
Roller assembly
3.
On traction units that have a serial number
greater than 313000001, install a conversion
bracket (right or left hand) to the under-side of
the appropriate rear corner of the deck frame
with a self-tapping screw (3/8 x 5/8 inch) (
Note:
Point the bracket toward the end of the
rear frame.
g024845
Figure 48
1.
Deck frame
5.
Self-tapping screw
2.
Flange nut
6.
Roller assembly
3.
Conversion bracket
7.
Self-tapping screw
4.
Screw
4.
Install the roller assembly to each conversion
bracket with a bolt (3/8 x 2-1/4 inches) and
flange nut (
Removing the Operator Platform
1.
Tilt the operator platform into its latched position
(
).
g032441
Figure 49
1.
Operator platform
27