2.
Disconnect the pivot arm and pivot bracket by
removing the hairpin securing the pivot pin and
washer (
).
g032774
Figure 50
1.
Washer
3.
Lift arm
2.
Pivot pin
4.
Hairpin
Note:
Retain or loosely install the hardware
that you removed during this procedure so that it
is available for seasonal changeover.
3.
Remove the 2 hairpin from the pivot pins that
connect the operator platform to the pivot
bracket (
).
g032443
Figure 51
1.
Hairpin
2.
Pivot pin
4.
Have an assistant help you remove the pivot
pins and the operator platform (
Note:
Set the deck aside for seasonal
conversion.
5.
Install each of the pivot pins you removed earlier
through the seat platform and pivot bracket, and
secure it with the hairpins.
Disconnecting the PTO
1.
Loosen the PTO drive-shaft bolts and nuts.
2.
Remove the roll pin and pull the drive shaft off
the gearbox shaft (
).
g004928
Figure 52
1.
Drive shaft
3.
Bolts
2.
Gearbox
4.
End yolk
Note:
Retain or loosely install the hardware
that you removed during this procedure so that it
is available for seasonal changeover.
Disconnecting the Summer Frame
1.
Remove the bolts and 2 cover plates to access
the nuts and bolts that secure the summer frame
to the machine (
g032736
Figure 53
1.
Bolts
2.
Cover plate
28