Connecting the PTO Drive
1.
Remove the 2 bolts that secure the operator
deck to the machine to access the PTO
connection (
g032576
Figure 78
1.
Bolt
2.
Operator deck
2.
Align the roll pin holes and slide the PTO yolk
over the PTO shaft on the winter frame (
g032627
Figure 79
1.
PTO shaft
4.
Locknut
2.
Bolt
5.
Roll pin
3.
PTO yolk
3.
Install the roll pin (
).
4.
Tighten the bolts to secure the yolk to the shaft.
5.
Use the 2 bolts (5/16 x 3/4 inch) you removed
earlier to secure the operator deck to the winter
frame (
).
Connecting the Hydraulic Hoses
1.
At the gear pump, loosen the supply-hose fitting
and rotate it toward the front of the machine
(
).
g032631
Figure 80
1.
Gear pump
2.
Supply hose
2.
Locate the 2 hoses that you removed from the
deck-lift cylinder and install the appropriate hose
cover to each hose.
3.
Use a cable tie to secure each end of the hose
cover to the hose.
4.
Route the hoses toward the front of the machine
(
).
g032632
Figure 81
1.
Tube connector
4.
Control valve
2.
Supply hose
5.
Return hose
3.
Gear pump
5.
Route the supply hose through the grommet and
connect it to the tube connector (
37