Important:
Always keep the battery fully charged
(1.265 specific gravity). This is especially important to
prevent battery damage when the temperature is below
32°F (0°C).
1.
Charge battery for 10 to 15 minutes at 25 to 30 amps
or 30 minutes at 10 amps.
2.
When the battery is fully charged, unplug the charger
from the electrical outlet, then disconnect the charger
leads from the battery posts (Figure 58).
3.
Install the battery in the machine and connect the
battery cables, refer to Installing the Battery.
Note:
Do not run the machine with the battery
disconnected, electrical damage may occur.
Figure 58
1.
Positive Battery Post
3.
Red (+) Charger Lead
2.
Negative Battery Post
4.
Black (-) Charger Lead
Servicing the Fuses
The electrical system is protected by fuses. It requires
no maintenance, however, if a fuse blows check the
component/circuit for a malfunction or short.
1.
The fuses are located on right hand console next to
the seat (Figure 59).
2.
To replace the fuses, pull out on the fuse to remove it.
3.
Install a new fuse (Figure 59).
Figure 59
1.
Optional accesory-15 amp
4.
Main-25amp
2.
Charge-25amp
5.
Console
3.
PTO-10amp
42
Summary of Contents for 74901 Z Master 5000
Page 66: ...Schematics Wire Diagram Rev A 66 ...
Page 67: ...Notes 67 ...