©Tornado International Ltd. 2019
-6-
Confidential
1.02 Setting out the equipment:
1. Before starting the installation place the consoles on the floor in the position they are to be mounted. The
consoles may be mounted either indoors or outside. Console number “1” should be on the left with the
consoles running in numerical order to the right.
2. Place the power supply unit (PSU) in the position it will be used.
Caution!
The PSU must be mounted in such a position that the public do not have access to it.
3. Place the chargers in the position they will be used. Air vents at the top of the case and above the battery
enclosure provide cooling. It is important that the chargers are positioned so that there is an uninterrupted
flow of cool air over the vents.
Caution!
The chargers must be mounted indoors and in such a position that the public do not have access to them.
They must be protected from water.
4. Check that the PSU and charger mains cables will reach the electric supply sockets.
5. Lay out the 24V PSU cable and check that it is long enough to reach from the master console to the PSU.
Note!
The PSU cable must not be lengthened without consulting Tornado International Ltd.
Tip!
The master console can be identified by an additional door to the right of the coin acceptor door. It is usual-
ly numbers 3/4 or 5/6. It is the console with the transmitter inside.
6. If you have more than one console open the console door (the key is in the spares pack) and locate the
console cable coiled up inside. Check that the cables from all additional consoles reach the console connec-
tion sockets inside the master console.
Note!
The console cables must not be lengthened without consulting Tornado International Ltd.
When you have satisfied yourself that all of the units are suitably positioned the installation can begin.
1N00-510 Genesis Boat User Manual v3 05/19