1.10 Power up & testing
All of the stages described in sections 1.01 to 1.09 should be completed before these instructions are
followed. The power to the unit will be turned on and the primary functions of the unit will be tested manu-
ally. This will allow the unit to be entered into service. The test procedures will duplicate some of the tests
carried out at the factory prior to shipment. All aspects of every unit’s operation are tested as the last stage
of production.
If you encounter any problems please check to ensure you have carried out the installation correctly. If you
still have a problem please make a note of the exact nature of the fault, all of the symptoms and the serial
number of the unit, then telephone the Tornado International Ltd technical helpline.
©Tornado International Ltd. 2019
-14-
Confidential
Dia 1 - Driving controls
Credit display
Credit button
Green play light
Red finish light
Forward/reverse stick
Steering wheel
1. Turn on the PSU by plugging it in to a wall outlet.
2. Check the lights on the loop output board. There should be a solid green light to indicate that the loop is
tuned. (See 1.06 Dia 1). Customers with previous experience of Tornado equipment will be familiar with
“tuning the loop”. This is now not required as a manual operation and is carried out automatically. If a solid
green light is not shown please contact Tornado service department for assistance.
3. Check that the red finish lights on all of the consoles are turned on. (see Dia 1)
4. Calibrate the forward/reverse sticks on each playing position by pushing them fully forward and fully
backward.
5. Turn the playtime control on the master timer to maximum (fully clockwise). (See 1.06 Dia 1)
6. Observing the credit displays introduce enough coins/tokens to purchase one play. The counters should
show 1 credit and the green credit button should flash. (see Dia 1) Repeat for each playing position.
7. Press the green credit button. The credit button should stop flashing and remain on constantly, the red
finish light should turn off and the green play light should come on. (see Dia 1) Repeat for each playing
position.
8. At the end of the set time a sounder will be heard, the green play light will turn off and the red finish light
should turn on.
1N00-510 Genesis Boat User Manual v3 05/19