26
·
·
·
·
·
·
·
·
·
※
4) “Wait Time” can be set manually, please refer to “Set”
※
5) After measuring, the result will be displayed. Press [
▲
] or [
▼
] to switch the page.
※
6) After being saved, the point name will increase or descend automatically.
After measuring, press [
▲
] or [
▼
] key to switch the pages
Measure 1/2
Rod Ave:0.8263m
Dist Ave:18.818m
N:3
δ
:0.04mm
Measure 2/2
Meas#:12
PN:1
Distance display:
N-times: average surveying value
Continuous: last surveying value
N: Surveying time
δ
: Standard offset
measured point name
point name
3.2 S.O G.H (Stake out Ground Point)
System can measure the height of corresponding point B by the height value (Ha+ H),
which is calculated by the height (Ha) of the known point A. The measurement result
will not be saved.
Please see the example in the next page.