46
9. Sight at the staff in the
foresight point (Fr1) and press
[MEAS].
10. Focus and sight at the staff in
the backsight point (Bk2) and
press [MEAS].
11. Press [IN/SO] to choose
“Intermediate point and Stakeout
measurement”
12. Choose “Stake Out” and press
[ENT].
13. Whether to load the ground
height data, [ENT] for yes,[ESC]
for no.
14. Input the ground height and
press [ENT].
15. Input the point name of
stakeout point and press [ENT].
Sight at Fr1
[MEAS]
Sight at Bk 2
[MEAS]
[IN/SO]
[
▲
] or [
▼
]
[ENT]
[ESC]
[ENT]
S.O point
name
[ENT]
Level BIF
Fr1
PN :P01
Press [MEAS] to meas
Level BIF
Bk2
PN :P01
Press [MEAS] to meas
Level BIF
Fr2
PN :P02
Press [MEAS] to meas
Level BIF
InterMediate
►
Stake Out
Stake Out
Load Data
?
Yes: [ENT] No: [ESC]
InterMediate
Rod Ave
:
0.9030m
Dist Ave
:
17.008m
N:3
δ
:0.02mm
InterMediate
SaveData [REC]
Continue [ENT]
Exit [ESC]