
VS-32-L
30
F
W
0
K
B3
Partial axis
55
53
26 23
52
195
8.2. Setting the zero position
The zero position of the welding station is set up such that the feather key
(26)
of the
driving shaft
(23)
is parallel to the partial axis of the bearing shell. The contact surface
of the switch ring
(55)
is assigned to switch
B3 (195)
. The thread pin
(53)
of switch ring
2
(52)
is also parallel to the partial axis.
8.3. Setting the clamping and opening positions
If the thread pin
(53)
of the triple switch ring
(52)
is also found on the partial axis, the
subsequent clamping and opening positions are correct as well.
The toothed wheel
(18)
of the opening curve must be plugged such that the cam roller
(32)
fits closely to the radius of the opening curve
(14)
. The curve flank is then vertical
to the partial axis.
Positions 1 to 3
are engraved on the toothed wheel
(29)
and can be
controlled there.
3
2
1
Curve flank
29
52
14
18
53
32
B 13 GB 26/06