04/03/2015
Orion - Gulliver
User Manual
8
2.
General precautions
2.1.
Precautions
Never leave the floor doors open.
Before shutting-down the system (i.e. for a foreseen extended period of disuse), bring the Platform
lift to its lowest served floor and make sure that all of the doors are perfectly closed.
Never enter the shaft area beneath the Platform Lift.
Never disconnect the power from the main panel unless absolutely necessary (i.e. during long
periods of absence, strong storms, maintenance operations, etc.)
2.2.
Positioning the machinery
The Control panel should be located within a locked environment or cabinet (“machine
room”). The
keys to the machine room should always be available in case of emergency situations.
The machine room must respect the following conditions:
The machine’s users should only access the machine room for the purpose of attending to
emergency situations.
The machine room must be weatherproof, free of humidity and have a room temperature
between 5 and 40 °C.
2.3.
Electrical connection
In accordance with current regulations, the Platform Lift’s electrical connection must be performed
by qualified personnel.
The system must be connected to a power supply which conforms to the data provided on the
electrical panel
TECHNICAL DATA
VOLTAGE
Single phase 230V
10%,
50/60Hz
CONSUMPTION WHILE IN
FUNCTION
Max.
15 A
2.4.
Learning procedure
Each time the electrical control panel is switched on with the platform at the ground floor (knob on
the front panel to the ON position), to operate the machine, press the additional button on the
electrical panel until the system performs an acquisitional travel to the 1st floor. Once it has arrived
at this floor, the system can be called by any of the floor button panels and, when the platform lift
arrives, the electric lock will unlock and self-learning procedure will be completed. In the event that
the system is at a floor other than the ground floor, to start up learning procedure, call the system
to the ground floor and then press the additional button on the electrical panel until the system
performs an acquisitional travel to the 1st floor.
Summary of Contents for gulliver
Page 2: ...04 03 2015 Orion Gulliver User Manual 2...
Page 7: ...04 03 2015 Orion Gulliver User Manual 7 1 1 Declaration of Conformity...
Page 22: ...04 03 2015 Orion Gulliver User Manual 22...
Page 23: ......
Page 24: ......