Light maintenance 

 
The  THYSSENKRUPP  ENCASA  S.R.L.  Platform  Lift  only  requires  the  owner  to  perform  simple 

maintenance operations. 
 

It  is  advisable  to  keep  the  rubber-coated  load  surface  clean;  it  can  be  washed  with  common 
detergents for rubber; after cleaning, dry the load surface thoroughly before using the Platform Lift 

again. 
 

If  the  walls  of  the  cabin  or  of  the  protective  panel  are  in  plasticized  sheet-metal,  they  should  be 

cleaned with neutral detergents and water. Chemical solvents should never be used for any reason 
whatsoever as they could damage the material. Dry thoroughly after cleaning. 

 
If the Platform lift is equipped with a "cabin", the cleaning of the walls should be done as described 

in the previous points. Choose the detergent to be used based on the type of wall covering material. 
Dry thoroughly after cleaning. 

 
The floor doors are in varnished metal, like the shaft (in those versions where it has been provided.) 

Such  parts  can  be  cleaned  by  using  water  and  normal  detergents  for  domestic  use.  Chemical 
solvents  should  not  be  used  for  any  reason  whatsoever  as  they  could  damage  the  material.  Dry 

thoroughly after cleaning. Use the same procedure for any glass parts if present. 
 

Check for oil leaks around the hydraulic control panel. If any leaks are found, contact maintenance 
personnel. 

 
If the Platform Lift’s alarm should be set off and you wish to silence the warning signal while waiting 

for maintenance personnel to arrive, disconnect the Platform Lift’s electrical supply as described. 
 

6

 

Maintenance 

 
A maintenance contract, in accordance with the Italian Presidential Decree no. 459 and Ministerial 

Memorandum  no.  157296  dated  14/04/1997,  must  be  stipulated  with  a  service  company  which 
has been approved by THYSSENKRUPP ENCASA for all operations which the user cannot carry out. 

Regular maintenance of the Platform Lift, including at least two annual overhauls, will guarantee the 
continued efficiency of all of the parts which make up the Platform Lift and is indispensable for its 

safe and proper function. 
 

Before  performing  any  maintenance  operations  upon  the  Platform  Lift,  switch  it  off  by 
turning the electrical panel’s main switch to the 0 (zero) position. Reactivate the Platform Lift 

once the maintenance operations have been completed. 

 

7

 

Internal lighting 

 
The  internal  part  of  the  Platform  Lift  is  lit  by  a  ceiling  lamp  (in  configurations  equipped  with  a 

protective panel) or by two spot lights (in configurations with cabin, protective panel and canopy). 
The light goes out automatically, if the platform stops at a floor, within a pre-set time of 30 seconds, 

if no command buttons are pressed or if a door is not opened.

 

In the case of the ELEGANCE version, illumination is guaranteed by four halogen spot lamps, or else 

by a fluorescent bulb system, in the case of a false ceiling or by a matrix of LEDs. 
 

 

Summary of Contents for gulliver

Page 1: ...04 03 2015 Orion Gulliver User Manual 1 ThyssenKrupp Encasa Orion Gulliver Vertical Platform Lift User Manual USO OR04 EN 04...

Page 2: ...04 03 2015 Orion Gulliver User Manual 2...

Page 3: ...the system you have purchased Read this manual carefully It contains simple information advice and warnings which have been illustrated in a clear and concise manner Please preserve this manual in suc...

Page 4: ...anual doors or with EVO motorised door openers_______________ 13 4 2 1 How to call he Platform Lift from the floors______________________________________ 13 4 2 2 How to operate the Platform Lift from...

Page 5: ...hine down to the lower floor and turn off the main switch on the electrical control panel of the platform elevator At least once every 15 days periodically check correct functioning of the communicati...

Page 6: ...tion of emergency manoeuvres as shown below in this manual SKILLED PERSONNEL Person or entity in possession of the legal requirements and any necessary authorisations for the installation and or maint...

Page 7: ...04 03 2015 Orion Gulliver User Manual 7 1 1 Declaration of Conformity...

Page 8: ...perature between 5 and 40 C 2 3 Electrical connection In accordance with current regulations the Platform Lift s electrical connection must be performed by qualified personnel The system must be conne...

Page 9: ...General Alarm Button with siren 3 2 Push button panel autodialer system optional 1 Telephone Auto dial 2 Telephone Auto dial activation button press this button and the emergency call will be forward...

Page 10: ...ton panel inside of the cabin Platform in movement the platform is in movement toward one of the lower floors Platform in movement the platform is in movement toward one of the upper floors Constant p...

Page 11: ...med emergency numbers 3 6 Elegance Floor Call Station 1 Floor call button Configurations available in the catalogue Techno Classic and Modern 2 Signal Led Configurations available in the catalogue Tec...

Page 12: ...loor as described below After 2 minutes and 30 seconds the display or the emergency lamp where no display is present will begin to flash The internal alarm will begin to sound Having passed another 30...

Page 13: ...be opened by pressing the floor button on the panel or by pulling slightly on the door The door will automatically open after one of these actions has been performed 4 2 2 How to operate the Platform...

Page 14: ...c sensors to prevent against crushing hazards While the platform is moving if the sensor beam is interrupted by an obstacle it will immediately stop and the STOP signal will appear on the display This...

Page 15: ...ce personnel If the Platform Lift s alarm should be set off and you wish to silence the warning signal while waiting for maintenance personnel to arrive disconnect the Platform Lift s electrical suppl...

Page 16: ...pted by pressing the emergency STOP button or any other command button The safety systems if activated interrupt the automatic descent 8 3 MX2 telephone alarm system optional Indicators Yellow call in...

Page 17: ...lowed by the system identification message recorded during the system s installation Note the messages can be made to repeat at any time by pressing 5 on the keypad After about 30 seconds an automatic...

Page 18: ...echnical assistance YES Incorrect floor levelling the Platform Lift stops and is not aligned with the floor Turn the switch located on the electrical panel s door to the OFF position and request techn...

Page 19: ...rged by an internal battery charger on the electrical switch panel If the batteries are discharged or damaged if the platform is stopped at a floor the run commands both inside and outside are disable...

Page 20: ...sert the special triangular key in its apposite keyhole present on the door frame and turn it open the door carefully Make sure that the platform of the elevator is perfectly level with the exit floor...

Page 21: ...7 6 Verify overrun 7 3 8 7 Verify anti creep levelling floor levelling 7 3 9 8 Verification of the mechanical parachute switch 7 3 10 9 Check emergency button in the pit 7 3 11 10 Verify electrical sa...

Page 22: ...04 03 2015 Orion Gulliver User Manual 22...

Page 23: ......

Page 24: ......

Reviews: