background image

04/03/2015

 

Orion - Gulliver

 

User Manual 

 

 
 

 

21

 

12.  Final Checks 

 

Before  releasing  the  lift  for  use,  all  of  the  verifications  indicated  in  the  end-installation  list  found  in  the  user 

manual, must be performed. The list of tests found in the user manual must be filled out and signed by the 

installer. 

 

 

TYPE 

OF 

TEST 

PAR.  N. 

TEST 

RESULT 

Positive  Negative  Value 

Mec

ha

nic

al

 a

nd 

hy

dr

au

lic

 s

af

et

7.1 

Check correct reclosing of the floor door 

 

 

 

7.2.1 

Verification of the emergency manual descent 

 

 

7.2.2 

Verification of the parachute valve 

 

 

7.2.4 

Verification of the calibration of the pressure switch maximum pressure 

regulator 

 

 

7.2.5 

Verification of the mechanical parachute 

 

 

7.2.6 

Verify the safety anti-crush intervention of the cabin doors (only for versions 

OR41/GU41 

 

 

 

Verify suspension elements 

 

 

Electr

ic

al 

sa

fet

7.3 

Verify the well access intervention control

 

 

 

7.3.1 

Check operation of the locks and door closing contacts of the floor doors 

 

 

7.3.2 

Verify alarm operation 

 

 

7.3.3 

Verify the electrical emergency descent in a black-out condition 

 

 

7.3.5 
7.3.6 

Electrical ground insulation test and ground continuity test (indicate the 

value) 

 

 

7.3.7 

Verify overrun 

 

 

7.3.8 

Verify anti creep levelling/floor levelling 

 

 

7.3.9 

Verification of the mechanical parachute switch 

 

 

7.3.10  9 

Check emergency button in the pit 

 

 

 

7.3.11  10 

Verify electrical safety intervention in the well strut 

 

 

7.3.12  11 

Verify electrical safety intervention in the header strut 

 

 

7.3.13  12 

Verify voltage to batteries 

 

 

 

Mac

hi

ne 

op

era

tion

 c

yc

le

 

7.4.1 

Interior machine movement commands 

 

 

7.4.2 

Floor call commands 

 

 

7.4.3 

“STOP” button activation 

 

 

7.4.4 

Test at nominal speed with maximum load (see load limit) 

 

 

7.4.4 

Static test with load equal to load limit multiplied by 1.25 

 

 

7.4.5 

Verify the free spaces between the well and the platform (indicate maximum 

value) 

 

7.4.5 

Verify the stopping distance (indicate maximum value) 

 

7.4.6 

Verify the intervention of the photocells or the cabin sensitive edge (only for 

versions OR04/GU04) 

 

 

7.4.7 

Verify the safety anti-crush intervention of the cabin doors (only for versions 

OR41/GU41 

 

 

7.4.8  10 

Verify optical sensor operation (for versions OR42/GU42 only) 

 

 

 

** 

11 

Verify presence of signage 

 

 

** 

12 

Verify operation of the telephone or intercom/switch-group telephone 

 

 

 

** 

13 

Make sure the door unlock triangular emergency key is present in the 

"separate and known" location, reserved for use by educated persons

 

 

 

 

 
        Date 

 

 

 

 

 

 

 

Installer Signature / Stamp 

 
____________ 

 

 

 

 

 

_________________________________ 

Summary of Contents for gulliver

Page 1: ...04 03 2015 Orion Gulliver User Manual 1 ThyssenKrupp Encasa Orion Gulliver Vertical Platform Lift User Manual USO OR04 EN 04...

Page 2: ...04 03 2015 Orion Gulliver User Manual 2...

Page 3: ...the system you have purchased Read this manual carefully It contains simple information advice and warnings which have been illustrated in a clear and concise manner Please preserve this manual in suc...

Page 4: ...anual doors or with EVO motorised door openers_______________ 13 4 2 1 How to call he Platform Lift from the floors______________________________________ 13 4 2 2 How to operate the Platform Lift from...

Page 5: ...hine down to the lower floor and turn off the main switch on the electrical control panel of the platform elevator At least once every 15 days periodically check correct functioning of the communicati...

Page 6: ...tion of emergency manoeuvres as shown below in this manual SKILLED PERSONNEL Person or entity in possession of the legal requirements and any necessary authorisations for the installation and or maint...

Page 7: ...04 03 2015 Orion Gulliver User Manual 7 1 1 Declaration of Conformity...

Page 8: ...perature between 5 and 40 C 2 3 Electrical connection In accordance with current regulations the Platform Lift s electrical connection must be performed by qualified personnel The system must be conne...

Page 9: ...General Alarm Button with siren 3 2 Push button panel autodialer system optional 1 Telephone Auto dial 2 Telephone Auto dial activation button press this button and the emergency call will be forward...

Page 10: ...ton panel inside of the cabin Platform in movement the platform is in movement toward one of the lower floors Platform in movement the platform is in movement toward one of the upper floors Constant p...

Page 11: ...med emergency numbers 3 6 Elegance Floor Call Station 1 Floor call button Configurations available in the catalogue Techno Classic and Modern 2 Signal Led Configurations available in the catalogue Tec...

Page 12: ...loor as described below After 2 minutes and 30 seconds the display or the emergency lamp where no display is present will begin to flash The internal alarm will begin to sound Having passed another 30...

Page 13: ...be opened by pressing the floor button on the panel or by pulling slightly on the door The door will automatically open after one of these actions has been performed 4 2 2 How to operate the Platform...

Page 14: ...c sensors to prevent against crushing hazards While the platform is moving if the sensor beam is interrupted by an obstacle it will immediately stop and the STOP signal will appear on the display This...

Page 15: ...ce personnel If the Platform Lift s alarm should be set off and you wish to silence the warning signal while waiting for maintenance personnel to arrive disconnect the Platform Lift s electrical suppl...

Page 16: ...pted by pressing the emergency STOP button or any other command button The safety systems if activated interrupt the automatic descent 8 3 MX2 telephone alarm system optional Indicators Yellow call in...

Page 17: ...lowed by the system identification message recorded during the system s installation Note the messages can be made to repeat at any time by pressing 5 on the keypad After about 30 seconds an automatic...

Page 18: ...echnical assistance YES Incorrect floor levelling the Platform Lift stops and is not aligned with the floor Turn the switch located on the electrical panel s door to the OFF position and request techn...

Page 19: ...rged by an internal battery charger on the electrical switch panel If the batteries are discharged or damaged if the platform is stopped at a floor the run commands both inside and outside are disable...

Page 20: ...sert the special triangular key in its apposite keyhole present on the door frame and turn it open the door carefully Make sure that the platform of the elevator is perfectly level with the exit floor...

Page 21: ...7 6 Verify overrun 7 3 8 7 Verify anti creep levelling floor levelling 7 3 9 8 Verification of the mechanical parachute switch 7 3 10 9 Check emergency button in the pit 7 3 11 10 Verify electrical sa...

Page 22: ...04 03 2015 Orion Gulliver User Manual 22...

Page 23: ......

Page 24: ......

Reviews: