6. Initial Installation
Diamond digital
79
LED ERROR
(Master G3)
LED ERROR (Slave
G10)
Blinks in the monitor mode (see above, BTS-internal use). Error in-
dication is made with the LED row STATUS.
LED LAN (G2)
Network activity indicator, is switched on with each LAN coprocessor
cycle. The LED serves the qualitative judgement of the line load.
LED row STATUS
(Master G13...G20)
(Slave G21...G28)
Status indicator of the power-up test.
See the section ”Error Diagnosis” in the service manual.
LED
Test
G13/G21
RAM-Test
G14/G22
Service-Term (DUART 1 Channel B)
G15/G23
INT3-Test
G16/G24
EPROM-Test
G17/G25
DUART 1 Channel A, DUART 2 Channel A + B
G18/G26
INT2-Test
G19/G27
Hardware I/O
G20/G28
unused
At the beginning of the test, all used LEDs are lit. After having passed
the test, the associated LED is switched off. Switching-off is made
from the left to the right. This, however, is hardly perceptible when
powering up, since the tests – except for the RAM and EPROM
checks – are very fast.
If a certain test failed, the LED stays lighted. An exception is the lowest
LED which indicates during normal operation the error ”NO CHEAP-
ERNET COMMUNICATION” in addition to the running light.
When all tests have been passed, a kind of running light appears on
the LED row. This shows immediately whether the controller operates
in the normal mode.
The running light is operated by the microcomputer only if it is not oc-
cupied with something more important.
Thus, the speed of the running light allows a qualitative judge-
ment of the the computer activity.
Summary of Contents for DD10
Page 1: ...DD5 DD10 DD20 DD30 Production Switchers Planning Installation BTS CAM1 CAM1 ...
Page 9: ...About this manual Diamond digital ...
Page 27: ...1 General Diamond digital 18 ...
Page 58: ...5 Connection and Startup Diamond digital 49 ...
Page 105: ...6 Initial Installation Diamond digital 96 ...
Page 163: ...10 Block diagrams Diamond digital 154 ...
Page 165: ...10 Block diagrams Diamond digital 156 ...