27
V
alue
S
erieS
V-710DM M
anual
STEP 5:
Verifying Proper
Installation
Before you move on to Section 4, How to Operate, verify the installa
-
tion is properly done by reading the following to prevent any opera
-
tional problems:
• Review of installation
• Manual test to verify
Review of Installation
Please notice the two applications covered in the text to follow:
vacuum base and
inserter
.
Vacuum Base Applications
For the
vacuum base
installation, it is recommended you check the
following to ensure a proper installation:
1. Review all vacuum base preparations to make sure they have
been properly done.
2. Check electrical connection.
3. Make sure feeder is properly trapped (or centered).
Inserter Applications
For the
inserter
installation, it is recommended you check the follow
-
ing to ensure a proper installation:
1. Review all inserter preparations to make sure they have been
properly done.
2. Check alignment of feeder with station.
3. Check electrical connection.
4. Make sure feeder is properly secured to the deck plate.
Summary of Contents for Streamfeeder V-710DM
Page 1: ...Manual Value Series V 710DM ...
Page 7: ...v Value Series V 710DM Manual ...
Page 47: ...40 Value Series V 710DM Manual 7 Mechanical Components BASE FEATURES ...
Page 49: ...42 Value Series V 710DM Manual BASE FEATURES ...
Page 51: ...44 Value Series V 710DM Manual CARRIAGE ASSEMBLY Assembly 10501102 ...
Page 55: ...48 Value Series V 710DM Manual HOLD DOWN ASSEMBLY Assembly 10501109 ...
Page 57: ...50 Value Series V 710DM Manual GATE PLATE ASSEMBLY Assembly 84111006 ...
Page 59: ...52 Value Series V 710DM Manual TRIANGLE WEDGE ASSEMBLY Assembly 63311018 ...
Page 61: ...54 Value Series V 710DM Manual 8 Electrical Components ...
Page 62: ...55 Value Series V 710DM Manual ...
Page 63: ...56 Value Series V 710DM Manual ...
Page 64: ...57 Value Series V 710DM Manual ...
Page 71: ...64 Value Series V 710DM Manual ...
Page 72: ......