2
Item Quantity
Description
1
1
RTV Tube
2
1
Power Connection Boot
3
2
Conductor Wire Pins
4
1
Braid Wire Pin
5
1
Ground Sleeve
6
1
End Cap
7
1
Tape Strip (PETK-3-ECM only)
8
1
Grommet (PETK-3-ECM only)
9
1
End Termination Caution Label
Tools Required . . .
Certifi cations/Approvals . . .
Kit Contents . . .
1
2
6
4
3
8
5
7
9
1
2
6
4
3
8
5
7
9
Item Quantity
Description
1
1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid
3
1
Junction Box Base with O-Ring
4
1
Nut
5
1
Banding
6
1
Banding Guide
7
1
Electronic Control Module w/ Terminal Blocks
(Refer to terminal speci
fi
cations for maximum allowable wire size)
ECM Type*
C - Controler
L - Limiter
CL - Controller/Limiter
* The maximum pipe exposure temperature is limited to 232°C
8
1
Junction Box Lid Cord
9
3
Blind Plug
Terminator-LN-Tool
(order separately)
3 mm
8 mm
28 mm
Warnings . . .
• Due to the risk of electrical shock, arcing and
fi
re
caused by product damage or improper usage,
installation or maintenance, a ground-fault protection
device is required.
• Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be
installed in accordance with the regulations as per the
norm EN IEC 60079-14 for hazardous areas (where
applicable), or any other applicable national and local
codes.
• Component approvals and performance ratings are
based on the use of Thermon speci
fi
ed parts only.
• De-energize all power sources before opening
enclosure.
• Avoid electrostatic charge. Clean only with a damp
cloth.
• Keep ends of heating cable and kit components dry
before and during installation.
• Minimum bending radius of heating cable is 32 mm
(except HPT is 57 mm and FP is 19 mm).
• Individuals installing these products are responsible
for complying with all applicable safety and health
guidelines. Proper Personal Protective Equipment
(PPE) should be utilized during installation. Contact
Thermon if you have any additional questions.
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-1
for RSX, VSX, BSX
PETK-2
for KSX, HTSX
PETK-3-ECM
for HPT, FP
The following installation procedures are suggested
guidelines for the installation of the Terminator ECM-P-XP Kit.
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the
proper type and quantity has been received.
4. Store in a dry location.
Dimensions . . .
205mm
II 2 (2) G Ex eb mb [ib] IIC T4, Ex tb IIIC T135°C SIRA 12ATEX5239X
II 2 (2) D Ex tb IIIC T135°C IP66 Db
International Electrotechnical Commission
IEC Certifi cation Scheme for Explosive Atmospheres
SIR 12.0103X
Terminator
TM
ECM-P-XP
INSTALLATION PROCEDURES
1725
II 2 GD Ex eb mb [ib]ib I
IC T4, Ex tb I
IIC T135°C
S
IRA 12A
TEX5239X
IP66
-60
°
C
≤
Ta
≤
+ 55
°
C
IECEx S
IR 12.0103X Ex eb mb [ib]ib I
IC T4, Ex tb
IIIC T135°C
PN 27673
Do
no
t ope
n while energized. See in
sta
llat
ion
in
st
ru
ct
io
ns
.
Te
r
mi
nator E
CM
Fo
r
us
e
as
an
ad
just
able
electronic contro
l m
od
ule
Crimp Tool 2,5mm
2