background image

DeviceLink Connect

 Troubleshooting  |   27

Network

I am using Ethernet 
for my network 
connection, but my 
device is offline.

Down network

Confirm with your local IT to resolve the network 
outage.

LAN port being used 
for the network 
Ethernet cable.

The port labeled LAN on the rear of the mote should 
be used during the Commissioner process. However, 
after the Commissioning process is complete, the 
ethernet cable should be disconnected from the LAN 
port and connected into the PoE IN port on the wall 
adapter which is plugged into the wall for AC power. 
See 

Getting Started

 section for details/images.

Network / 
Commissioner

My network settings 
do not conform to 
the basic settings of 
the Wi-Fi 
Commissioner 
application tab.

Network requires 
advanced mode setup.

Review the “Advanced Network Configuration 
Setup” setup in this manual to perform advanced 
network setup. Contact your local IT department for 
assistance. Thermo Fisher Scientific technical 
support can provide assistance on function, but will 
not be able to facilitate your network setup without 
your facility's IT assistance.

Network / 
Commissioner

The settings in the 
network section of 
the Commissioner 
application do not 
work.

Improperly modified 
settings on the Cloud, 
NTP, and/or DHCP 
tabs of the 
Commissioner 
application.

Settings on the Cloud, NTP, and/or DHCP tabs of the 
Commissioner should not need to be modified during 
normal setup, unless directed by Thermo Fisher 
Scientific. If modifications have been made, attempt 
a factory reset of the mote (see Factory Reset 
instructions in this table). After reset, try to 
recommission the device. If the issue persists, please 
contact technical support to troubleshoot your 
settings.

Network / 
Commissioner

My Wi-Fi network 
does not appear in 
the Wi-Fi 
Commissioner 
window.

Refresh the Wi-Fi 
networks.

Press the “Scan WiFi Networks” button. This should 
refresh the visible networks available in the 
application.

Desired SSID/network 
is hidden.

Hidden networks will not appear in the selectable 
networks in the Wi-Fi window. You can enter the 
SSID (network) and password directly into the input 
boxes.

Network / 
Commissioner

My Wi-Fi network 
does not require a 
password but the 
Commissioner 
application is asking 
for a password.

Incorrect 
Authentication mode 
selected.

In the Wi-Fi tab of the Commissioner application, 
select the “Open” authentication mode. This will 
remove the need for a password to be entered.

Password / 
Commissioner

I'm unable to 
change the default 
Commissioner 
application 
password.

Password 
requirements not met.

Commission application password requirements:

1.

The password must be between 12 and 32 
characters long.

2.

The password must not include the username or 
mac address of the mote.

3.

The password must not have more than 
5 repeated characters.

4.

The password must not be one of the 100,000 
common passwords (ex: “password1234”)

Symptom

Issue

Potential Cause

Solution

Summary of Contents for DeviceLink Connect

Page 1: ...332858H01 Revision A February 2022 DeviceLink Connect Configuration and Installation Instruction Guide...

Page 2: ...amount paid by the client for said product Under no circumstances shall the seller or creator assume responsibility for any dam age or prejudice whatsoever direct or indirect specific or consequentia...

Page 3: ...endations 4 Applicable Equipment Models 4 DeviceLink Connect Independent Sensors 5 Technical Specifications 6 Mote Specifications 6 Independent Sensor Specifications 7 Getting Started 8 Prerequisites...

Page 4: ...21 InstrumentConnect Monitoring Application 22 Managing Users 22 Favorites 22 Disconnecting Instruments 23 Scheduling an Instrument 23 Collections 23 Viewing Instrument Data 24 Downloading Data Creati...

Page 5: ...red as medical device and has therefore not been registered with a medical device regulatory body e g FDA These devices are not to be used for any medical purposes Environmental Operating Conditions T...

Page 6: ...s use the specific Power Injector adapter provided by Thermo Fisher Scientific Do not open the adapter yourself and do not dismantle internal components or modify them in any manner The adapter does n...

Page 7: ...ance This device complies with ISED s license exempt RSS standard s Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 This device must accept...

Page 8: ...ceLink Connect is not supported For a complete list of compatible equipment by model number go to www thermofisher com DLCequipment Table 1 Equipment Models Equipment Type Brand Equipment Series Name...

Page 9: ...nk Connect Model Number Additional cable connections required Temperature PT100 DLCPTTEMP001 DLCPTSMRT001 CO2 DLCPTCO2A001 Current 0 50 A DLCPTCURT001 DLCPTSMRT002 Current 0 80 A DLCPTCURT002 DLCPTSMR...

Page 10: ...recharges in 5 hours or less 2600 mAH 3 6 V Compliant with UL 2054 second edition dated 10 29 2004 including revisions through 2 11 2011 The DeviceLink Connect mote contains a Li Ion battery which IAT...

Page 11: ...01 n a Temperature RH Temperature RH CO2 Interface USB RS485 RJ45 RS485 RJ45 System Accuracy Temp 1 C RH 3 RH Temp from 10 C to 30 C 0 5 C Temp from 40 C to 10 C 0 6 C RH at temps from 0 C to 40 C an...

Page 12: ...a supported web browser application and Wi Fi or Ethernet port Installing the DeviceLink Connect Step 1 Setup Your Hardware Connect your DeviceLink Connect mote to the instrument being monitored via t...

Page 13: ...mote Install any additional independent sensors desired See Installing Independent Sensors section for added instructions Install provided USB Commissioner dongle into any 1 of the 4 USB ports on the...

Page 14: ...Ethernet Figure 4 LAN port on DeviceLink Connect Mote Turn your DeviceLink Connect mote on by sliding the power switch on the front of the mote to the ON position Figure 5 Mote OFF ON Switch Step 2 Es...

Page 15: ...proceed directly to the Sensors setup 4 Navigate to the WiFi screen using the left navigation bar or links on the welcome screen a Click the Scan WiFi Networks button to scan for available networks Fi...

Page 16: ...or freezer incubator etc The asset serial number is used for associate and link data coming from the equipment for display on Thermo Connect c Click Deploy Once the deployment is complete you will see...

Page 17: ...t 60 seconds and refresh the page Click on the Pending Request banner Figure 14 Pending Request on InstrumentConnect screen 4 Accept the request 3 Figure 15 Accepting request connects to InstrumentCon...

Page 18: ...er into the rectangular Insert Release slot for the wire that you want to remove Inserting the micro screwdriver into the slot requires some additional downward pressure to actually open the wire clam...

Page 19: ...ective cover 8 Secure the temperature sensor next to the control sensor In some units use of grommets may be necessary to ensure the sensor tip does not come in contact with exposed metal surfaces ins...

Page 20: ...r access port 12 Restore power and restart the unit 13 Using the RTD Smart Sensor Cable insert and secure the sensor wires See instructions above 14 Connect the sensor to the desired USB port on the m...

Page 21: ...oxy Plastic Bonder The mounting surface must be thoroughly cleaned and dried with the included alcohol pad prior to affixing the brackets to the asset Pre requisites Paper towels 70 alcohol solution i...

Page 22: ...nt the bracket to the asset door Press down firmly with at least 15 psi for 30 seconds to make a good seal a Top of the door is best b All of the adhesive tape must be flush and in contact with the mo...

Page 23: ...with RADIUS authentication server WPA Enterprise Key management for CCMP and TKIP WPA and full IEEE 802 11i RSN WPA2 RSN PMKSA caching pre authentication IEEE 802 11r EEE 802 11w Wi Fi Protected Setu...

Page 24: ...one NTP server in order to maintain the correct time The default NTP server URLs built in to the mote may work or the customer IT group may provide their own NTP server URL s 1 Select NTP from the men...

Page 25: ...mote is connecting via an Ethernet connection then uncheck the box directly under PoE Adapter Configuration 3 When either box is unchecked a form will appear with several blank fields 4 The customer I...

Page 26: ...From this dashboard you are able to see all the instruments connected to your Thermo Connect account Figure 26 InstrumentConnect dashboard Managing Users The first user to connect to an instrument is...

Page 27: ...Scheduling an Instrument Collections From the top menu go to the Collections tab This tool allows an Admin to group instruments and share them with other users on Thermo Connect Creating a New Collec...

Page 28: ...at the top of the graph event log container Indicate which report type is desired CSV or PDF Figure 33 Create Report You will see a notice at the top of the screen indicating your report generation is...

Page 29: ...ork outage and subsequently the amount of data needing to be backfilled to the cloud the backfill process may take several hours to occur Deployment Commissioner I press Deploy and the system will not...

Page 30: ...he notification in InstrumentConnect but I am not seeing the new device Page has not been refreshed Refresh the InstrumentConnect web browser page and or application window If after a refresh your dev...

Page 31: ...ioner should not need to be modified during normal setup unless directed by Thermo Fisher Scientific If modifications have been made attempt a factory reset of the mote see Factory Reset instructions...

Page 32: ...nt left of the mote to the On position The switch is slightly recessed Loss of AC power at the outlet Consult facilities to ensure AC power is provided to the device Power DeviceLinkConnect not operat...

Page 33: ...on the mote Sensors not assigned properly in Commissioner setup Reinsert the USB commissioning dongle this may require you to temporarily remove a sensor if all 4x USB ports are in use Follow the step...

Page 34: ...t application to Accept your new device connection If you do not receive this notification within 30 minutes re commission the device following the steps in the Commissioner application per the Gettin...

Page 35: ...374 91 22 6716 2200 India 91 22 6716 2200 91 22 6716 2200 Italy 32 02 95059 552 39 02 95059 552 432 254 375 Japan 81 3 5826 1616 81 3 3816 3355 Netherlands 31 76 579 55 55 31 76 571 4440 Nordic Baltic...

Reviews: