CHROMELEON Listings
Page 60 of 60
M1393R0
OQ/PQ Operating Instructions
pump.%A.Equate =
"100% water + 0.1% FA"
pump.%B.Equate =
"Mob. phase A + 0.8% acetone"
pump.%C.Equate
=
"%C"
pump.%D.Equate
=
"%D"
0.000
UV.Autozero
%B
=
0
%C
=
0
%D
=
0
Wait
UV.Ready and Pump.Ready and Sampler.Ready
Inject
pump.Flow
=
0.4
%B
=
0
%C
=
0
%D
=
0
4.000
pump.Flow =
0.000
Loading_Pump.Flow
=
0.000
%B
=
0
%C
=
0
%D
=
0
5.000 Lamp
=
Off
End