7.
If necessary, install a new Ion S5
™
Cleaning Solution bottle.
Note:
The Ion S5
™
Cleaning Solution bottle contains sufficient reagent to complete 4 cleanings.
8.
Close the door, then tap
Next
.
The instrument confirms that the consumables and chip are properly installed and that the Ion S5
™
Cleaning Solution contains sufficient reagent to perform the post-run clean. Follow all on-screen
recommendations to ensure proper installation of required consumables.
IMPORTANT!
If the allowed number of post-run cleans has been met, the instrument prompts the
user to replace the Ion S5
™
Cleaning Solution bottle.
Note:
If a
Checking Reagent: Failed
warning appears, see “Bottle leak check fails”
9.
When initialization is complete (~50 minutes), tap
Home
.
The instrument is now ready for a sequencing run.
For information on recycling and disposal of used components, see “Reagent consumables disposal”
.
Chapter 5
Initialize the sequencer
Initialize the sequencer
5
48
Ion 520
™
& Ion 530
™
ExT Kit − Chef User Guide
Summary of Contents for Ion 520
Page 77: ......