Dionex Easion Operator’s Manual
32
Doc. 155028-01 08/20
4. Click
Prime
on the Chromeleon ePanel (see
–or–
Open the Command window (by pressing the
F8
key), select the
Pump
command, and select the
Prime
option.
5. The pump will begin pumping at about 3 mL/min. Continue priming the
Dionex Easion until no air bubbles are exiting the pump waste line.
6. Click the pump
Off
button on the Chromeleon ePanel.
7. Close the waste valve.
Do not overtighten.
The pump is now ready for
operation.
NOTE A convenient way to verify that the waste valve is closed
is to select the pump flow rate required for your
application, turn on the pump, and then close the valve.
The pressure should rise to the value expected for the
application and quickly stabilize.
Figure 3-3. Priming the Pump
Waste Valve
(Open)
Secondary
Pump Head