39
COMBUSTION AND EFFICIENCY TESTING FOR
OIL FIRED CENTRAL FURNACES.
Complete this form for each furnace installed. Read instruction
CUSTOMER
NAME
ADDRESS
CITY, STATE
HEATING
SYSTEM
BURNER
MODEL
NO.
AIR SHUTTER OPENING
INS.
% OF MAX. (EST)
FURNACE
MODEL
TYPE OF VENTING SYSTEM
MASONRY
CHIMNEY
METAL
CHIMNEY
SIDEWALL
POWER VENTER
MASONRY
CHIMNEY
W/INDUCER
METAL
CHIMNEY
W/INDUCER
MASONRY CHIMNEY
W/METAL LINER
FUEL LINE FILTER
DRAFT CONTROL
COMBUSTION
TESTS
(Operate burner
at least 10
minutes before
CO2 in stack pipe
INITIAL
SERVICE
SERVICE
SERVICE
INSTALLATION
Draft Over-fire
Draft in stack pipe
Smoke number
Furnace room temp.
Gross stack temp.
Net stack temp.
(Gross stack minus
furnace room temp.)
Efficiency
Nozzle size and spray
Date
NOTES:
INSTALLER NAME & ADDRESS
manual carefully before making tests. Retain this form with furnace.
furnace.
BLAST TUBE LGTH.
Tests taken by
starting tests.)
COMBUSTION
CHAMBER
CONDITION
MATERIAL
FURNACE SERIAL NUMBER
Oil pump pressure
Operation of Controls
Burner Safety Controls
Check for oil leaks
Summary of Contents for THV1M119A960SA
Page 2: ......
Page 4: ......
Page 6: ...2...
Page 36: ...32 V Sequence of Operations Flow Chart...
Page 37: ...33...
Page 38: ...34 VI Trouble Shooting Flow Chart...
Page 39: ...35...
Page 40: ...36...
Page 41: ...37...
Page 42: ...38...
Page 44: ...40 Appendix A Replacement Parts for THV1M119A...
Page 45: ...41...
Page 46: ...42 Appendix B THV1M119A960SA PSC Wiring Diagram...