24
Heat Mode
When a call for heat (“W”) is received from the thermostat, if the “Cool” mode is not already active, the
“T-T” terminal is energized and the blower on delay is started. The on-off pattern of DIP switch SW2
(positions 1 and 2) select one of four blower on delay values (see Table 11). When the delay time has
elapsed, the “HEAT” blower speed is energized. The control remains in steady heat mode until the
thermostat is satisfied. When the call for heat signal is removed, the “T-T” terminal is de-energized and
the blower off delay is started. The on-off pattern of DIP switch SW2 (positions 3 and 4) select one of
four blower off delay values (see Table 8). When the delay time has elapsed, the “HEAT” blower
speed terminal is de-energized.
DIP SWITCH 2 SECTION STATE
BLOWER DELAY TIMES
1
2
3
4
Counter Flow
ON - SEC
ON - SEC
OFF - MIN
OFF
OFF
15
30
ON
OFF
24
60
OFF
ON
36
120
ON
ON
48
240
OFF
OFF
2
ON
OFF
4
OFF
ON
6
ON
ON
8
Table 8: ON and OFF Blower Delay Time Switch Settings
Motor Blower Speed
Three interconnected blower speed outputs are provided. A “G” call for fan will provide power to the
LOW speed tap only. A “W” heat call will provide power to the Heat speed tap only. A “Y” cooling call
will provide power to the Cool speed tap only.
In the case of thermostat calls for “Y” and “W” together, blower speed selection will be determined by
the input that was first initiated. In the case where the control is in a cooling mode with both “Y” and
“W” inputs energized and then the “Y” input is removed, the cooling blower off time will be executed
prior to the control switching into a heating mode. In the case where the control is in a heating mode
with both “Y” and “W” inputs energized and then the “W” input is removed, the heating blower off time
will be executed prior to the control switching into a cooling mode. In the case where a call for fan “G”
already exists and either a “W” or a “Y” call is initiated, the blower speed will switch to the respective
“W” or a “Y” speed following the blower on delay for that call.
The speed taps are interconnected and interlocked, only one speed may be powered at any one time.
When a speed is to be operated, the speed select relays are operated to select the path to the motor
tap and then the enable relay is operated to switch the operating power to the selected motor speed
tap. If the speed of the running motor is to be changed, first the enable relay removes power from the
motor, the new speed is selected and then power is restored to the motor.
Blower On and Off Delays
Four Heat blower on and four blower off delays are selected by two dip switches for each function.
Refer to Table 11 for specific delay values.
Summary of Contents for THV1M119A960SA
Page 2: ......
Page 4: ......
Page 6: ...2...
Page 36: ...32 V Sequence of Operations Flow Chart...
Page 37: ...33...
Page 38: ...34 VI Trouble Shooting Flow Chart...
Page 39: ...35...
Page 40: ...36...
Page 41: ...37...
Page 42: ...38...
Page 44: ...40 Appendix A Replacement Parts for THV1M119A...
Page 45: ...41...
Page 46: ...42 Appendix B THV1M119A960SA PSC Wiring Diagram...