All installations and services must be performed by qualified service personnel.
41
The proper thermostat heat anticipator setting is 0.4 Amps for furnace operation only. To increase length
of cycle, increase setting of heat scale; to decrease length of cycle, decrease setting of heat scale.
Anticipators for the cooling operation are generally pre-set by the thermostat manufacturer and require
no adjustment. Anticipators for the heating operation are of two types, pre-set and adjustable. Those that
are pre-set will not have an adjustment scale and are generally marked accordingly.
4. CLQS1 (Single Stage) Blower Motor Speed Wiring
Figure 13
: TURN OFF THE ELECTRICAL POWER to the furnace before attempting to change
blower speed wiring.
A. The furnace is factory wired to the ignition control with standard heating and cooling speeds. When
changing motor speeds, simply switch the needed speed to either the heating or cooling terminal as
applicable on the module to obtain the desired CFM. The unused speeds should then be reconnected
to the module in the “park” positions.
B. The optional blower delay jumpers on the integrated control (Figure 13) are used to determine the
length of the heat delay–to-fan-off periods. The delay-to-fan-on period is preset and non-adjustable.
The available options for the delay-to-fan-off are as follows: 60, 90, 120 & 180 sec.
The fan speed jumper will determine which motor speed tap (Hi-cool, Heat, or Lo-cool) is energized
when only the “G” terminal has a 24VAC signal.
The factory default for optimum performance of the delay-to-fan-off period is 180 seconds.
Summary of Contents for CLQS1-050T36N
Page 2: ......
Page 4: ......
Page 47: ...All installations and services must be performed by qualified service personnel 45...
Page 55: ...All installations and services must be performed by qualified service personnel 53...
Page 56: ...All installations and services must be performed by qualified service personnel 54...
Page 57: ...All installations and services must be performed by qualified service personnel 55...
Page 59: ...All installations and services must be performed by qualified service personnel 57...
Page 60: ...All installations and services must be performed by qualified service personnel 58...