All installations and services must be performed by qualified service personnel.
62
CLQS1-100T (Single Stage with Constant Torque blower motor)
Temperature Rise (°F)
External Static Pressure (in WC)
Speed Tap
0.1
0.2
0.3
0.4
0.5
0.6
0.7
Low (Red)
71
75
79
84
90
100
109
Med Low (Purple)
62
65
68
72
74
79
83
Med (Blue)
60
62
66
69
72
75
79
Med High (Yellow)
55
56
58
61
63
66
68
High (Black)
49
50
51
53
57
61
67
Airflow (CFM)
External Static Pressure (in WC)
Speed Tap
0.1
0.2
0.3
0.4
0.5
0.6
0.7
Low (Red)
1239
1178
1107
1046
976
883
806
Med Low (Purple)
1414
1357
1295
1224
1186
1120
1062
Med (Blue)
1467
1416
1341
1276
1229
1177
1119
Med High (Yellow)
1601
1558
1505
1448
1391
1340
1301
High (Black)
1799
1762
1716
1646
1547
1438
1322
Current (A)
External Static Pressure (in WC)
Speed Tap
0.1
0.2
0.3
0.4
0.5
0.6
0.7
Low (Red)
3.9
4.1
4.2
4.3
4.4
4.5
4.5
Med Low (Purple)
4.8
4.9
5.1
5.2
5.2
5.3
5.5
Med (Blue)
5.1
5.2
5.4
5.5
5.6
5.6
5.8
Med High (Yellow)
6.0
6.1
6.3
6.4
6.5
6.6
6.7
High (Black)
7.3
7.5
7.7
7.9
7.6
7.3
6.9
Power (W) *
External Static Pressure (in WC)
Speed Tap
0.1
0.2
0.3
0.4
0.5
0.6
0.7
Low (Red)
328
341
351
359
370
379
386
Med Low (Purple)
406
422
434
446
452
464
477
Med (Blue)
434
451
464
473
483
490
502
Med High (Yellow)
523
540
557
569
579
589
597
High (Black)
655
668
689
712
683
656
612
Note: Shading indicates recommended operating range for heating.
* Includes 120W to power controls.
Cooling Unit
HTG Speed
Recommended CLG Speed
30,000
Med (Blue)
Low (Red)
36,000
Med (Blue)
Med Low (Purple)
42,000
Med (Blue)
Med High (Yellow)
48,000
Med (Blue)
High (Black)
Alterations Req'd For A/C @ Design External Static Pressure
Summary of Contents for CLQS1-050T36N
Page 2: ......
Page 4: ......
Page 47: ...All installations and services must be performed by qualified service personnel 45...
Page 55: ...All installations and services must be performed by qualified service personnel 53...
Page 56: ...All installations and services must be performed by qualified service personnel 54...
Page 57: ...All installations and services must be performed by qualified service personnel 55...
Page 59: ...All installations and services must be performed by qualified service personnel 57...
Page 60: ...All installations and services must be performed by qualified service personnel 58...