Hilliard Clutch Maintenance
139
6. Apply Mobil
TM
(see Tool Catalog) grease to
roller bearing and fill cavity between large and
small spacers. A small amount of grease
should also be applied to the seal lip and space
between the seal and roller bearing.
7. Pack ball bearing with Mobil
TM
(see Tool
Catalog) grease.
8. Apply a small amount of Loctite
TM
(see Tool
Catalog) to O.D. of ball bearing and press into
hub until seated against spacer. Wipe excess
Loctite
TM
from hub.
9. Install retaining ring.
10. Position shoes in a circle on flat surface and
install springs on shoes.
11. Position shoes on the hub.
12. Install 1/4-28 x 1-3/4 in. screws through links,
then external tooth 1/4 in. lockwasher. Then
slide through bushings in shoes and hub.
13. Install remaining lockwashers then links and
1/4-28 in. locknuts, torquing them to
110 ± 5 in.-lbs (12.5 ± 6 N•m).
NOTE: Shoes MUST be held tightly against
hub while nuts are tightened.
14. Place the hub and shoe assembly into the
housing and place flatwasher over the bearing.
15. Apply Loctite
TM
(see Tool Catalog) to 3/8-16
x 1 in. screw and install through washer into
housing shaft. The housing and hub will be
drawn together to the proper relative position
as the screw is tightened. Tighten the screw to
30 to 35 ft.-lbs (41 to 48 N•m).
1.
Roller Bearing, Pack with Mobil
TM
(see Tool
Catalog) grease
2.
Pack These Areas with Mobil
TM
(see Tool
Catalog) grease at Assembly
3.
HEX HD Cap Screw (6X), 1-4/28 UNF X 1.75
Long. Torque to 110 ± 5 in-lbs (12.5 ±.6 N•m)
NOTE: Shoes must be disengaged while
tightening 6 bolts and MUST be held
tightly against hub while nuts are
tightened.
4.
Bearing, Fill with Mobil
TM
(see Tool Catalog)
grease Approximately 0.32 oz (70 to 80% full)
5.
3/8-16 UNC x 1.00 Long, Flat Head Socket Cap
Screw with Nylox Insert / Apply Loctite
TM
(see
Tool Catalog) and Torque to 30 to 35 ft.-lb
(41 to 48 N•m)
6.
Serial Nameplate
Figure 61: Clutch
Summary of Contents for 914970
Page 3: ...3...
Page 10: ...Table of Contents 10...
Page 40: ...Operating Instructions 40...
Page 82: ...Electronic Controls 82...
Page 92: ...Electrical Maintenance 92...
Page 124: ...Refrigeration Maintenance 124...
Page 140: ...Hilliard Clutch Maintenance 140...
Page 160: ...Refrigeration Diagrams 160...
Page 163: ...Index 163 W wiring 85 wiring diagrams 165...
Page 164: ...Index 164...
Page 166: ...Wiring and Schematic Diagrams Index 166...
Page 167: ...167 Cab Control RD Wiring Diagram...
Page 168: ...168 RD w o Thermostat Cab Control Schematic...
Page 169: ...169 RD Cab Box Wiring Diagram...
Page 170: ...170 RD Cab Control w Thermostat Schematic Diagram...
Page 171: ...171 RD 50 STD 3 Phase Wiring Diagram Page 1 of 2...
Page 172: ...172 RD 50 STD 3 Phase Wiring Diagram Page 2 of 2...
Page 173: ...173 RD 50 STD 3 Phase Schematic Diagram Page 1 of 2...
Page 174: ...174 RD 50 STD 3 Phase Schematic Diagram Page 2 of 2...
Page 175: ...175 RD 30 STD Wiring Diagram Page 1 of 2...
Page 176: ...176 RD 30 STD Wiring Diagram Page 2 of 2...
Page 177: ...177 RD 30 STD Schematic Diagram Page 1 of 2...
Page 178: ...178 RD 30 STD Schematic Diagram Page 2 of 2...
Page 179: ...179 RD 30 C S Wiring Diagram Page 1 of 2...
Page 180: ...180 RD 30 C S Wiring Diagram Page 2 of 2...
Page 181: ...181 RD w CYCLE SENTRY Schematic Diagram Page 1 of 2...
Page 182: ...182 RD w CYCLE SENTRY Schematic Diagram Page 2 of 2...
Page 183: ...183 RD 50 C S 3 Phase Wiring Diagram Page 1 of 2...
Page 184: ...184 RD 50 C S 3 Phase Wiring Diagram Page 2 of 2...
Page 185: ...185 RD w CYCLE SENTRY Schematic Diagram Page 1 of 2...
Page 186: ...186 RD w CYCLE SENTRY Schematic Diagram Page 2 of 2...