![Thermo King 914970 Manual Download Page 138](http://html1.mh-extra.com/html/thermo-king/914970/914970_manual_1104406138.webp)
Hilliard Clutch Maintenance
138
7. Press bushings out of hub.
Figure 59: Bushing Removal
8. Remove inner race of roller bearing from the
housing shaft.
NOTE: This race had Loctite
TM
applied and
was pressed in place. A puller will be
required to remove it.
NOTE: Make sure the center of the housing
is supported and not the outer drum of the
housing.
Assembly Procedure (Using New
Bearings and Seal)
1. Press bushings into hub side opposite flange.
NOTE: It is important to press bushings in
straight.
The bushings should also be centered in the
hub socket leaving relatively equal amounts
of bushing sticking out of the hub on each
side.
A suggested simple tool for pressing in
bushing to hub is a 1/4 in. screw x 3 in. or 4 in.
long and 1/4 in. nut. Thread nut onto screw
approximately 3/4 to 1 in.
Insert threaded end of screw into bushing.
Lubricate bushing by dipping in clean water
only. Then press into place.
Figure 60: Bushing Insertion
*DO NOT USE SOAP OR OIL TO
LUBRICATE BUSHING PRIOR TO
ASSEMBLY.
2. Remove the inner race from the roller bearing,
apply a small amount of Loctite
TM
(see Tool
Catalog) to race I.D. and press onto the
housing shaft, seating against the step.
3. Apply Loctite
TM
(see Tool Catalog) to O.D. of
oil seal, then press seal in end of hub opposite
the flange to a depth of approximately 1/16 in.
below the surface.
4. Apply a small amount of Loctite
TM
(see Tool
Catalog) to O.D. of roller bearing and press
into hub bore from the flange end until seated
against the step in bore.
5. Slip large and small spacer into hub I.D.
seating against the roller bearing.
CAUTION: During all bearing assembly,
care must be taken to prevent Loctite
TM
from entering bearing.
Summary of Contents for 914970
Page 3: ...3...
Page 10: ...Table of Contents 10...
Page 40: ...Operating Instructions 40...
Page 82: ...Electronic Controls 82...
Page 92: ...Electrical Maintenance 92...
Page 124: ...Refrigeration Maintenance 124...
Page 140: ...Hilliard Clutch Maintenance 140...
Page 160: ...Refrigeration Diagrams 160...
Page 163: ...Index 163 W wiring 85 wiring diagrams 165...
Page 164: ...Index 164...
Page 166: ...Wiring and Schematic Diagrams Index 166...
Page 167: ...167 Cab Control RD Wiring Diagram...
Page 168: ...168 RD w o Thermostat Cab Control Schematic...
Page 169: ...169 RD Cab Box Wiring Diagram...
Page 170: ...170 RD Cab Control w Thermostat Schematic Diagram...
Page 171: ...171 RD 50 STD 3 Phase Wiring Diagram Page 1 of 2...
Page 172: ...172 RD 50 STD 3 Phase Wiring Diagram Page 2 of 2...
Page 173: ...173 RD 50 STD 3 Phase Schematic Diagram Page 1 of 2...
Page 174: ...174 RD 50 STD 3 Phase Schematic Diagram Page 2 of 2...
Page 175: ...175 RD 30 STD Wiring Diagram Page 1 of 2...
Page 176: ...176 RD 30 STD Wiring Diagram Page 2 of 2...
Page 177: ...177 RD 30 STD Schematic Diagram Page 1 of 2...
Page 178: ...178 RD 30 STD Schematic Diagram Page 2 of 2...
Page 179: ...179 RD 30 C S Wiring Diagram Page 1 of 2...
Page 180: ...180 RD 30 C S Wiring Diagram Page 2 of 2...
Page 181: ...181 RD w CYCLE SENTRY Schematic Diagram Page 1 of 2...
Page 182: ...182 RD w CYCLE SENTRY Schematic Diagram Page 2 of 2...
Page 183: ...183 RD 50 C S 3 Phase Wiring Diagram Page 1 of 2...
Page 184: ...184 RD 50 C S 3 Phase Wiring Diagram Page 2 of 2...
Page 185: ...185 RD w CYCLE SENTRY Schematic Diagram Page 1 of 2...
Page 186: ...186 RD w CYCLE SENTRY Schematic Diagram Page 2 of 2...