29
shown in Figure 10).
iv. Locate boiler(s) with lowest input closest to
chimney/vertical common vent.
v. Chimney lining must be acceptable for use
with condensing flue gases.
vi. Install a condensate drain to collect any
condensate that may form in the lined
chimney or vertical common vent (refer to
figure 10).
CAUTION
Installing multiple vent terminations close
together promotes frost build up on buildings.
To minimize this possibility, extend the distance
from the building to the end of the vent
termination and increase the horizontal distance
between vent terminations.
4.
Air Intake Piping
a. Consult intake pipe manufacturer for common
air intake pipe sizing.
b. Refer to Figures 11 and 12 for common air intake
guidelines for modular boilers.
c. Individual air intake pipes may be used in lieu of
common air intake piping.
d. Common air intake straight lengths and fittings
should be assumed to have the equivalent length
the same as an individual air intake pipe, used
for a given boiler intake pipe diameter.
e. Position horizontal air intake termination center
line below horizontal vent termination's center
line.
f. Vertical air intake pipe must terminate at least
two (2) feet above the closest portion of the roof.
g. Refer to the Combustion Air section for further
warnings, cautions, notices and instructions.
5.
Water Piping
a. Refer to Figures 13 thru 18 for typical water
piping for modular boilers.
b. Installing a low water cut-off in the system
piping is highly recommended and may be
required by Code, if not factory mounted on
boiler.
c. Refer to Table 1 for pressure drop and flow
requirements for each boiler.
d. Consult I=B=R Installation and Piping Guide.
e. Maintain ½" minimum distance between water
piping and combustible material.
f. Refer to Water Piping and Trim section
for further warnings, cautions, notices and
instructions.
6.
Gas Piping
a. Refer to National Fuel Gas Code, Local Codes
and Tables 2 through 7 for gas pipe sizing.
b. Refer to Gas Piping section for further warnings,
cautions, notices and instructions.
NOTICE
The pressure drop given in Table 1 is for the
boiler only. The pressure drop of each system
fitting and component must be added to the
boiler pressure drop to determine the system
pressure head requirement. See Table 6 for
fitting and component equivalent lengths.
Summary of Contents for EVO-1000
Page 13: ...13 Figure 4 Vertical Pressurized Venting...
Page 15: ...15 Figure 5 Typical Negative Pressure Conventional Venting...
Page 17: ...17 Figure 7 Vertical Air Intake Piping...
Page 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram on off EVO 500 2000...
Page 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation EVO 500 2000...
Page 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Page 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Page 32: ...32 Figure 13 Modular System Typical One Pipe Water Piping...
Page 33: ...33 Figure 14 Modular System Typical Primary Secondary Water Piping...
Page 34: ...34 Figure 15 Modular System Typical Primary Secondary without System Pump...
Page 35: ...35 Figure 16 Modular System Typical Reverse Return Water Piping...
Page 36: ...36 Figure 17 Modular System Reverse Return with System Pump Only...
Page 37: ...37 Figure 18 Modular System Typical Primary Secondary with Reverse Return...
Page 47: ...47 This Page Intentionally Left Blank...
Page 48: ...48 Troubleshooting Guide B Troubleshooting Guide...
Page 49: ...49 Troubleshooting Guide...
Page 53: ...53 This Page Intentionally Left Blank...
Page 54: ...54 Figure 19 Combustion Chamber Assembly...
Page 56: ...56 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Page 58: ...58 Figure 21 UL FM CSD 1 Main Gas Train Assembly...
Page 60: ...60 Figure 22a DB B DB B w POC Gas Train 500 750 Figure 22b DB B DB B w POC Gas Train 1000 2000...
Page 62: ...62 Figure 23 Jacket Panels 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Page 64: ...64 Figure 24a Control Panel Assembly On Off...
Page 66: ...66 Figure 24b Control Panel Assembly Modulation...
Page 68: ...68 Figure 25 Bishop Pilot Assembly...
Page 72: ...72 NOTES...
Page 73: ...73 NOTES...
Page 74: ...74 NOTES...
Page 75: ...75 NOTES...