WATER PIPING AND TRIM
CAUTION
Failure to properly pipe boiler may result in
improper operation and damage to boiler or
structure.
All piping either new or existing must be cleaned
with a tri sodium phosphate (TSP) solution to
remove mill scale and oils from the system.
Failure to do so could result in premature failure
of the heat exchanger (not covered by Thermal
Solutions Standard Warranty).
On an existing or retrofit system, a filter or
strainer must be installed on the system return
prior to the boilers.
Return water temperature below 120°F will cause
flue gas condensation inside the boiler. Flue gas
condensate can lead to boiler failure. Thermal
Solutions Standard Warranty does not cover
problems caused by flue gas condensation.
Supply and return water temperature differences
greater than 40°F at high fire can lead to boiler
failure. Thermal Solutions Standard Warranty
does not cover problems caused by temperature
differences greater than 40°F at high fire.
1. Design and install boiler and system piping to
prevent oxygen contamination of boiler water and
frequent water additions.
a. There are many possible causes of oxygen
contamination such as:
i
. Addition of excessive make-up water
as a result of system leaks.
ii
. Absorption through open tanks and fittings.
iii
. Oxygen permeable materials in the
distribution system.
b. In order to insure long product life, oxygen
sources must be eliminated. This can be
accomplished by taking the following measures:
i
. Repairing system leaks to eliminate the need
for addition of make-up water.
ii
. Eliminating and/or repairing fittings which
allow oxygen absorption.
iii
. Using of non-permeable materials in the
distribution system.
iv
. Isolating the boiler from the system water by
installing a heat exchanger.
v
. Using properly designed and operating air
elimination devices in water piping.
2. Connect system supply and return piping to boiler.
a. Refer to Figure 8.
b. Consult I=B=R Installation and Piping Guides.
c. Maintain ½" minimum distance between water
piping and combustible material.
d. Consult Thermal Solutions for unusual system
requirements.
CAUTION
Support weight of system piping adequately.
e. Design and install system piping to prevent
return water temperatures below 120°F. Refer
to Table 2 for boiler flow and pressure drop
requirements.
3. Remove protective cap from boiler drain line
located in the rear of the boiler .
4. Install drain valve in the boiler drain line at bottom
rear of the boiler.
5. If this boiler is used in connection with refrigeration
systems, the boiler must be installed so that the
chilled medium is piped in parallel with the boiler
using appropriate valves to prevent the chilled
medium from entering the boiler. Also consult
I=B=R Installation and Piping Guides. If this boiler
is connected to heating coils located in air handling
units where they may be exposed to refrigerated air,
the boiler piping must be equipped with flow control
valves to prevent gravity circulation of boiler water
during operation of the cooling system.
6. Install optional low water cut-off in system piping
above the boiler, if not shipped with boiler.
7. Install an air eliminating device to remove air from
the system.
Summary of Contents for EVO-1000
Page 13: ...13 Figure 4 Vertical Pressurized Venting...
Page 15: ...15 Figure 5 Typical Negative Pressure Conventional Venting...
Page 17: ...17 Figure 7 Vertical Air Intake Piping...
Page 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram on off EVO 500 2000...
Page 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation EVO 500 2000...
Page 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Page 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Page 32: ...32 Figure 13 Modular System Typical One Pipe Water Piping...
Page 33: ...33 Figure 14 Modular System Typical Primary Secondary Water Piping...
Page 34: ...34 Figure 15 Modular System Typical Primary Secondary without System Pump...
Page 35: ...35 Figure 16 Modular System Typical Reverse Return Water Piping...
Page 36: ...36 Figure 17 Modular System Reverse Return with System Pump Only...
Page 37: ...37 Figure 18 Modular System Typical Primary Secondary with Reverse Return...
Page 47: ...47 This Page Intentionally Left Blank...
Page 48: ...48 Troubleshooting Guide B Troubleshooting Guide...
Page 49: ...49 Troubleshooting Guide...
Page 53: ...53 This Page Intentionally Left Blank...
Page 54: ...54 Figure 19 Combustion Chamber Assembly...
Page 56: ...56 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Page 58: ...58 Figure 21 UL FM CSD 1 Main Gas Train Assembly...
Page 60: ...60 Figure 22a DB B DB B w POC Gas Train 500 750 Figure 22b DB B DB B w POC Gas Train 1000 2000...
Page 62: ...62 Figure 23 Jacket Panels 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Page 64: ...64 Figure 24a Control Panel Assembly On Off...
Page 66: ...66 Figure 24b Control Panel Assembly Modulation...
Page 68: ...68 Figure 25 Bishop Pilot Assembly...
Page 72: ...72 NOTES...
Page 73: ...73 NOTES...
Page 74: ...74 NOTES...
Page 75: ...75 NOTES...