DVOR 432
Operation and Maintenance
Installation
2-3
Ed. 01.04
3235
5604
3235
3235
5604
3235
1747
1747
1747
1747
3026
3026
250
1200
400
3225
5604
3225
3225
5604
3225
2790
250
450
250
500
2490
175
* xxxx
500
600
600
300
950
∅
13500
∅
25000
* xxxx= distance depends on counterpoise height
1200
1040
175
15°
15°
30°
30°
15°
15°
30°
30°
15°
15°
30°
30°
15°
15°
30°
30°
1747
3026
1747
3026
1747
all dimensions in mm
ladder
cable box
cable input
2490
1747
foundation
foundation
power/tel
not to scale
DVOR-counterpoise; foundation drawing
(for information only)
Fig. 2-3
Foundations for DVOR counterpoise and shelter (for information only)
Summary of Contents for DVOR 432
Page 2: ......
Page 4: ......
Page 16: ...DVOR 432 Table of Contents Operation and Maintenance X Ed 01 04 ...
Page 38: ...DVOR 432 General Information Operation and Maintenance 1 6 Ed 01 04 ...
Page 40: ...DVOR 432 General Information Operation and Maintenance 1 8 Ed 01 04 ...
Page 46: ......
Page 66: ...DVOR 432 Installation Operation and Maintenance 2 24 Ed 01 04 ...
Page 74: ......
Page 136: ...DVOR 432 Installation Operation and Maintenance 4 32 Ed 01 04 ...
Page 172: ...DVOR 432 Repairs Operation and Maintenance 6 22 Ed 01 04 ...
Page 186: ...DVOR 432 Repairs Operation and Maintenance 6 36 Ed 01 04 ...
Page 192: ...DVOR 432 Installation Operation and Maintenance Annex Nextfield AN 4 Ed 01 04 ...
Page 194: ......
Page 196: ...DVOR 432 General Operation and Maintenance Annex Nextfield L 2 Ed 01 04 ...
Page 204: ...DVOR 432 Alignment Procedure Operation and Maintenance Annex Nextfield AN 14 Ed 01 04 ...
Page 234: ...DVOR 432 Maintenance Operation and Maintenance Annex Nextfield AN 44 Ed 01 04 ...