DVOR 432
Operation and Maintenance
Table of Contents
VII
Ed. 01.04
LIST OF FIGURES
Fig.-No.
Title
Page
Fig. 1-1
DVOR in 10 ft container shelter for all types of transport
1-1
. . . . . . . . . . . . . . . . .
Fig. 1-2
DVOR with packing for rail or road transport
1-1
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 1-3
Packaging for rail and road transport
1-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 1-4
Packaging for and transport of the DVOR antenna domes
1-3
. . . . . . . . . . . . . . .
Fig. 2-1
DVOR siting criteria (general data)
2-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-2
Foundations for DVOR Shelter (for information only)
2-2
. . . . . . . . . . . . . . . . . . . .
Fig. 2-3
Foundations for DVOR counterpoise and shelter (for information only)
2-3
. . . .
Fig. 2-4
10 ft DVOR container shelter
2-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-5
Correct lifting with a lifting harness
2-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-6
Standard shelter, ground plan and electrical installation DVOR (example)
2-6
. .
Fig. 2-7
Antenna ring
2-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-8
Pipes for guiding the antenna cables
2-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-9
Lifting equipment for DVOR antenna installation
2-8
. . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-10
Installation of vertical pipes and installation point of antenna 1
2-9
. . . . . . . . . . .
Fig. 2-11
Installation direction of vertical pipe and antenna dome
2-9
. . . . . . . . . . . . . . . . .
Fig. 2-12
Spacing of vertical pipes of sideband antenna
2-10
. . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-13
Antenna ring, single antenna and vertical pipe
2-10
. . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-14
Connection diagramof individual radiators of the sideband antennas
2-11
. . . . .
Fig. 2-15
Sideband antenna with matcher/decoupling module pulled out
2-11
. . . . . . . . . .
(e.g.: antenna 2)
Fig. 2-16
Cabling of sideband antenna
2-12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-17
Cabling to the shelter
2-12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-18
Calibration capacitors on the antenna elements
2-13
. . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-19
Plate separation distance of capacitors CA as a function of
2-14
. . . . . . . . . . . . . .
the operating frequency
Fig. 2-20
Aligning the sideband antenna with the aid of bearing markers
2-14
. . . . . . . . . . .
Fig. 2-21
Diagrammatic site layout of DVOR monitor dipole
2-15
. . . . . . . . . . . . . . . . . . . . . .
Fig. 2-22
Mast with monitor dipole (example)
2-15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-23
Connections at the BCPS connection plate, C-bar and bottomplate
2-20
. . . . .
(100 W version)
Fig. 2-24
Cabling, BCPS connection plate, C-bar and bottomplate (100 W version) 2-21
Fig. 2-25
DVOR transmitter and ASU rack, top view, connectors
2-22
. . . . . . . . . . . . . . . . . .
Fig. 2-26
DVOR ASU rack, front side, connections
2-23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2-27
External wiring of auxiliary OIO connectors of LCP
2-29
. . . . . . . . . . . . . . . . . . . . . .
Summary of Contents for DVOR 432
Page 2: ......
Page 4: ......
Page 16: ...DVOR 432 Table of Contents Operation and Maintenance X Ed 01 04 ...
Page 38: ...DVOR 432 General Information Operation and Maintenance 1 6 Ed 01 04 ...
Page 40: ...DVOR 432 General Information Operation and Maintenance 1 8 Ed 01 04 ...
Page 46: ......
Page 66: ...DVOR 432 Installation Operation and Maintenance 2 24 Ed 01 04 ...
Page 74: ......
Page 136: ...DVOR 432 Installation Operation and Maintenance 4 32 Ed 01 04 ...
Page 172: ...DVOR 432 Repairs Operation and Maintenance 6 22 Ed 01 04 ...
Page 186: ...DVOR 432 Repairs Operation and Maintenance 6 36 Ed 01 04 ...
Page 192: ...DVOR 432 Installation Operation and Maintenance Annex Nextfield AN 4 Ed 01 04 ...
Page 194: ......
Page 196: ...DVOR 432 General Operation and Maintenance Annex Nextfield L 2 Ed 01 04 ...
Page 204: ...DVOR 432 Alignment Procedure Operation and Maintenance Annex Nextfield AN 14 Ed 01 04 ...
Page 234: ...DVOR 432 Maintenance Operation and Maintenance Annex Nextfield AN 44 Ed 01 04 ...