Automatic boiler for wood pellets
33
Connect:
Connection terminal
Feeder motor F2
X14- L, N, PE
Impulse sensor F2
X45
Electric ignition spiral
X4-L, N, PE
Primary Fan
X11-L, N, PE
Flue Fan (if used)
X12-L, N, PE
Feeder motor F1
X13- L, N, PE
Impulse sensor F1
X44
Flue thermometer
X31
Systém pump
X10-L, N, PE
Boiler pump
X7-L, N, PE
Servo 3 (4) – way valve
X5-L, N, PE, X6-L, N, PE
Room termostat
X46
Boiler termostat
X47
Outside temperature
X34
Thermometer behind 3 (4) – way valve X28
Thermometr back water
X29
Important note:
Fan and flue fan are controlled proportionally.
With MENU Diagnostics -
direct control
- to be checked by qualified personnel:
F1 feeder motor function and correct rotation direction
F2 feeder motor function and correct rotation direction
Correct functioning of F1 feeder impulse sensor and simultaneously
Correct functioning of F2 feeder impulse sensor
Functioning of fan and linearity of its regulation
Functioning of flue fan and linearity of his regulation (if used)
Functioning of system pump and its deaeration
Functioning of boiler pump and its deaeration
Functioning of motor and correct rotation direction of ash removal spiral screw
Functioning of exchange cleaning motor
Functioning and correct rotation direction of servomotor
Functioning and timing of servomotor between limit positions and agreement of timing with SW setting
Correct functioning of electric ignition spirals
Correct functioning of attached thermometers
Setting of a proper equithermal curve
Setting or changing servomotor timing
6.7
CHECKING TASKS BEFORE BOILER FIRST OPERATION
The authorized service technician preparing the boiler for its initial operation must perform the following tasks
before start-up. He will record results of all checking tasks – will fill a Certificate of Introduction to Service – see
appendix.
Checking water volume in the heating system and corresponding water pressure.
Check whether fittings between the boiler and the heating system are open.
Check the heating system for leaks at all new connections – pressure test done by a professional firm.
Check the chimney connection (must be tight and safe to prevent escape of flue gases). Chimney and
boiler connection must have valid inspection.
Check functionality of circulatory pump and its deaeration.
The electrical grid outlet must be always accessible. New electrical outlet must have a valid inspection..
Check the heating chamber and ash receptacles. Clean from possible dirt.
Check tank filling by specified fuel.
Check operating parameters for the specific boiler type.
Summary of Contents for KP 12-ES
Page 21: ...Automatic boiler for wood pellets 20 Picture No 15 Jacketing KP 22S KP 22 ES ...
Page 22: ...Automatic boiler for wood pellets 21 Picture No 16 Jacketing KP 62S KP 62 ES ...
Page 43: ...Automatic boiler for wood pellets 42 9 3 1 2Menu users settings ...
Page 45: ...Automatic boiler for wood pellets 44 Cleaning an ash removeing Skin Time window setting ...
Page 48: ...Automatic boiler for wood pellets 47 Actual values Configuration ...
Page 54: ...Automatic boiler for wood pellets 53 Cleaning Ash removing USB Time window setting ...
Page 55: ...Automatic boiler for wood pellets 54 Load from USB Save on USB ...
Page 60: ...Automatic boiler for wood pellets 59 ...
Page 62: ...Automatic boiler for wood pellets 61 ...
Page 63: ...Automatic boiler for wood pellets 62 i ...
Page 70: ...69 Picture No 31 Principle of the modulation ...
Page 72: ...71 Picture No 33 Directory information consuption wood pellets for boiler family KP ...
Page 73: ...72 Picture No 34 Circuit diagram control unit ...
Page 74: ...73 Picture No 35 Circuit diagram modul HZS 533 ...
Page 75: ...74 Picture No 36 Circuit diagram HZS 533 HZS 535 ...