Automatic boiler for wood pellets
32
6.5
INSTALLATION OF CERAMIC SHIELD
Insert the ceramic shield flatways across the boiler space and fit the part on holders over the door from inside.
Steps:
Picture No. 29 Ceramic top placement guide
6.6
CONNECTION OF ELECTRICAL PARTS
The electric parts connections can be performed by qualified personnel only. Connect the particular appliances
according with conection diagram. During connecting the equipment must be shut down with the main switch or
disconnected from power supply by pulling the electric cord from the outlet.
Picture No. 28 Ceramic shield
Summary of Contents for KP 12-ES
Page 21: ...Automatic boiler for wood pellets 20 Picture No 15 Jacketing KP 22S KP 22 ES ...
Page 22: ...Automatic boiler for wood pellets 21 Picture No 16 Jacketing KP 62S KP 62 ES ...
Page 43: ...Automatic boiler for wood pellets 42 9 3 1 2Menu users settings ...
Page 45: ...Automatic boiler for wood pellets 44 Cleaning an ash removeing Skin Time window setting ...
Page 48: ...Automatic boiler for wood pellets 47 Actual values Configuration ...
Page 54: ...Automatic boiler for wood pellets 53 Cleaning Ash removing USB Time window setting ...
Page 55: ...Automatic boiler for wood pellets 54 Load from USB Save on USB ...
Page 60: ...Automatic boiler for wood pellets 59 ...
Page 62: ...Automatic boiler for wood pellets 61 ...
Page 63: ...Automatic boiler for wood pellets 62 i ...
Page 70: ...69 Picture No 31 Principle of the modulation ...
Page 72: ...71 Picture No 33 Directory information consuption wood pellets for boiler family KP ...
Page 73: ...72 Picture No 34 Circuit diagram control unit ...
Page 74: ...73 Picture No 35 Circuit diagram modul HZS 533 ...
Page 75: ...74 Picture No 36 Circuit diagram HZS 533 HZS 535 ...