Terexlift
Zona Industriale I
06019 Umbertide (Pg)
Italy
Pre-Delivery Preparation
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Instructions
Use the operator’s manual on your machine.
The Pre-delivery Preparation consists of completing
the Pre-operation Inspection, the Maintenance items
and the Function Tests.
Use this form to record the results. Place a check
in the appropriate box after each part is completed.
Follow the instructions in the operator’s manual.
If any inspection receives an N, remove the machine
from service, repair and re-inspect it. After repair,
place a check in the R box.
Legend
Y = yes, completed
N = no, unable to complete
R = repaired
Comments
Fundamentals
It is the responsibility of the dealer to perform the
Pre-delivery Preparation.
The Pre-delivery Preparation is performed prior to
each delivery. The inspection is designed to discover
if anything is apparently wrong with a machine before
it is put into service.
A damaged or modified machine must never be used.
If damage or any variation from factory delivered
condition is discovered, the machine must be tagged
and removed from service.
Repairs to the machine may only be made by
a qualified service technician, according to the
manufacturer's specifications.
Scheduled maintenance inspections shall be
performed by qualified service technicians, according
to the manufacturer's specifications and the
requirements listed in the responsibilities manual.
Pre-Delivery Preparation
Y
N
R
Pre-operation inspection
completed
Maintenance items completed
Function tests completed