
3 – Physical Installation
DPN 402196 Issue 4.1
© Teledyne TSS
3- 5
Figure 3-3: SEP and PSU mounting arrangement
3.1.3 Coil Array
NOTE
You should read this section
before
you attempt to install the array of search-coils.
These details are
critical
to the successful operation and performance of the 440
System. Follow these instructions carefully to obtain the best performance from
the System and to avoid interference with other equipment on board the ROV.
The Teledyne TSS 440 system has much more stringent requirements than its
predecessor in terms of the coils and their mounting arrangements. The seawater
signals can be almost completely excluded, therefore the performance of the sys-
tem is limited mainly by the stability of the background compensation values (see
section 6.2.2.3 "Background Compensation" on page 6-22).
The background compensation values must be absolutely stable and repeatable if
good quality survey information is to be obtained. The coils must be mounted a
sufficient distance from the ROV, and clamped tightly. Further, the metalwork of
the ROV must not interfere with the compensation levels. This means that any
manipulators must be tightly stowed during both survey and compensation.
NOTE
The coil cable assembly (P/N: 601004/x) can be provided in 3, 4, 6, 8 or 10m
lengths. The cable length is identified by the ‘x’ suffix, i.e. 601004/4 for the 4m
cable assembly. The following table outlines the cable part numbers and associ-
ated lengths.
Summary of Contents for 440
Page 12: ...List of Figures x Teledyne TSS DPN 402196 Issue 4 1 ...
Page 18: ...Glossary xvi Teledyne TSS DPN 402196 Issue 4 1 ...
Page 24: ...1 Introduction 1 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 32: ...2 System Overview 2 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 66: ...4 Electrical Installation 4 20 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 88: ...5 Operating Software 5 22 Teledyne TSS DPN 402196 Issue 4 1 Figure 5 10 Altimeter Test ...
Page 144: ...6 Operating Procedure 6 40 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 154: ...7 Operational Considerations 7 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 164: ...8 System Specifications 8 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 203: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 17 Figure 10 15 SDC10 Dimensions ...
Page 230: ...A Operating Theory A 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 242: ...B Options B 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 244: ...C Altimeter C 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 246: ...D Reference D 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 248: ...D Reference D 4 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 250: ...D Reference D 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 252: ...D Reference D 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Page 254: ...D Reference D 10 Teledyne TSS DPN 402196 Issue 4 1 ...