
4220 Flow Meter
Section 4 Submerged Probe Installation
4-5
Figure 4-2 Spring Ring Preparation
Figure 4-3 Mounting Ring in a Round Pipe
CAUTION
Make sure the sensor cable is securely fastened along the
back (downstream) edge of the ring. Otherwise, the sensor
may provide
inaccurate level readings
under conditions of
high velocity.
Do not overtighten the plastic cable ties; they should be tight-
ened just enough to secure the cable in place, without greatly
indenting the cable. Overtightening the plastic ties may col-
lapse the reference tube in the cable, blocking it.
Flo
w
Summary of Contents for 4220
Page 2: ......
Page 4: ......
Page 8: ...4220 Flow Meter Safety ...
Page 14: ...vi ...
Page 19: ...4220 Flow Meter Section 1 Introduction 1 5 Figure 1 2 4220 Controls and Indicators ...
Page 28: ...4220 Flow Meter Section 1 Introduction 1 14 ...
Page 94: ...4220 Flow Meter Section 3 Installation 3 12 ...
Page 156: ...4220 Flow Meter Appendix A Replacement Parts A 2 ...
Page 157: ...4220 Flow Meter Appendix A Replacement Parts A 3 ...
Page 160: ...4220 Flow Meter Appendix A Replacement Parts A 6 ...
Page 164: ...4220 Flow Meter Appendix B Accessories List B 4 ...
Page 172: ...4220 Flow Meter Appendix C Programming Worksheets C 8 ...
Page 182: ...4220 Flow Meter Appendix D General Safety Procedures D 10 ...
Page 194: ......
Page 196: ...Warranty ...
Page 198: ......