Page 9
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2011 Telect, Inc., All Rights Reserved, 139249-1 A0
Remove the packaging materials around the enclosure, but leave the enclosure on the
shipping pallet.
NOTE:
If the cabinet is pre-mounted to an optional plinth, unbolt the plinth from
the pallet and store the mounting hardware close by in a safe place.
ALERT
!
ALERT! Do not lift the enclosure with the batteries installed.
Make sure you have figured the combined weight of everything you are lifting (~600 pounds for
the enclosure as configured by Telect plus any additional, customer-installed, auxiliary
equipment) before performing the lift. A site installation engineer should verify that you have
adequate support before you lift anything.
2.4 Maneuvering the Enclosure
Procedure steps:
1. Attach lifting equipment to the eye bolts.
2. Lift the enclosure with hoist system.
Make sure the straps are equal in length
to balance the load, a minimum of 24" to
minimize the lateral load on the eye-
bolts, as shown in Figure 3.
3. After the enclosure is in place, remove
the eye bolts and replace them with the
enclosed bolts as soon as the enclosure is secured.
This procedure is complete.
24
”
m
in
im
u
m
24
”
m
in
im
u
m
Figure 3 - Lifting Measurements