![Telebyte CFA-24 Reference Manual Download Page 44](http://html1.mh-extra.com/html/telebyte/cfa-24/cfa-24_reference-manual_1079741044.webp)
Model CFA-24 Transparent Cable Farm Automation Switch Reference Manual Page 40 of 78
Use the Prev and Next buttons to navigate from one VG to another. This may be necessary when there are a large
number of VG’s.
➢
Anytime the Coordinate Matrix is updated, confirm the Check to Add MP boxes of the Test Maintenance screen
are correct and press Save before setting any line length in the “SET LENGTH” screen.
For the example screen on the previous page, the resulting available line lengths are:
VG1 (Channels 1-4): 0, 20, 50, 100, 200, 700
VG2 (Channels 5-8): 0, 20, 30, 50, 70, 80, 100, 120, 130, 150, 170, 180, 200, 500, 520, 530, 550, 570, 580, 600, 620,
630, 650, 670, 680, 700