Performance Verification
OI1125 E/O Transmitter Instruction Manual
33
Table 11: Test equipment (cont.)
Description
Example product
Minimum requirements
Optical cable, PM
FC-APC Single mode, 18 cm
Tektronix part number
174-4664-00
Optical cable, PM
FC-APC Single mode, 2 m
Tektronix part number
174-4725-00
Optical cable
FC-APC to FC/PC, Single mode, 2 m
Tektronix part number
174-4727-00
Attenuator, electrical
6 dB, 50
W
, SMA
Tektronix part number
015-1001-00
Torque wrench
5/16-in, 7-10 in-lb. (8 mm, 79 to
112 N-cm)
Pasternack Enterprises
PE 5011-1
Setup For PV
1. Before beginning these procedures, photocopy the test record on page 57 and
use it to record the performance test results.
2. Install the laser safety interlock on the back of the instrument, or short pins 1
and 2 of the DB-25 remote port connector. (See Figure 9 on page 16.)
Summary of Contents for OI1125
Page 4: ......
Page 8: ...Table of Contents iv OI1125 E O Transmitter Instruction Manual...
Page 20: ...Getting Started 8 OI1125 E O Transmitter Instruction Manual...
Page 30: ...Operating Basics 18 OI1125 E O Transmitter Instruction Manual...
Page 36: ...Specifications 24 OI1125 E O Transmitter Instruction Manual...
Page 38: ......
Page 42: ...Theory of Operation 30 OI1125 E O Transmitter Instruction Manual...
Page 72: ...Performance Verification 60 OI1125 E O Transmitter Instruction Manual...