![Tektronix DAS 9221 Option 04 User Manual Download Page 230](http://html1.mh-extra.com/html/tektronix/das-9221-option-04/das-9221-option-04_user-manual_1077973230.webp)
Appendix F: User Service
F–18
DAS System User Manual
Red-Striped Wire
Pin 1
Figure F–5: Installing the GPIB Connector
Replacing the Line Fuse
The following procedure describes how to change the line fuse for the main-
frame. To change the fuse, perform the following steps:
1. Power off the system unit.
2. Wait 60 seconds and disconnect the power cord from the system unit. This
allows time for the power-down sequence to complete.
3. Remove the line fuse and replace it with the appropriate fuse. Table F–3 lists
the fuses and the Tektronix part number.
Table F–3: System Unit Fuse Replacement
Line Operation
Fuse
Tektronix Part Number
115 VAC
15 A, 250 V, Fast blow
159-0256-00
230 VAC
10 A, 250 V, 3AG
159-0057-00
Summary of Contents for DAS 9221 Option 04
Page 4: ......
Page 6: ......
Page 16: ...Table of Contents x DAS System User Manual ...
Page 20: ...General Safety Summary xiv DAS System User Manual ...
Page 23: ......
Page 48: ......
Page 81: ......
Page 156: ......
Page 166: ...Appendix B Accessories B 4 DAS System User Manual ...
Page 178: ...Appendix C Error Messages C 12 DAS System User Manual ...
Page 238: ...Appendix F User Service F 26 DAS System User Manual ...
Page 249: ......
Page 266: ......
Page 275: ......
Page 276: ......