FRANÇAIS
TEKNO POINT ITALIA S.R.L. - VIA DELL’ARTIGIANATO 5 - 30020 MARCON (VE) – ITALY
MUI_CAIO_Ita_Eng_Fra_TP/Rev.06/Data 21.02.2022
82
01
1150
1100
700
600
02
1200
1100
800
700
03
1200
1150
900
800
04
1250
1200
1000
900
05
1250
1200
1000
950
06
1300
1250
1050
1000
07
1350
1250
1100
1050
08
1350
1300
1100
1100
09
1400
1350
1150
1150
Nominalairflow volume: 900m
3
/h
10. END INSTALLATION CHECKS AND START-UP
A fewsimple checks guarantee the correctoperation of thesystem:
Before switching on the condensingunit, make sure that:
•
Be adequately and firmlyfixed (ifmounted on brackets,check that the rubber
antivibrationmountings are wellfixedbetween the machine and the bracket).
•
The electrical connections, includingearthing, are carriedout in accordance with the national laws in
force.
•
The refrigeration lines are sealed (check all connections).
•
The hydraulic system is leak-proof and leak-free.
•
The supply voltagedoesnotdiffer from the ratedvalue. above ± 10%.
•
The coolantvalves are open.
•
The water circuittaps are open.
•
Check the electrical connections.
•
In multisplit models, carry out the test first with only oneevaporator turned on and then the next
one (in this way anywrong connections with the ventilatingunits are highlighted)
•
Make sure the water iscorrectlydrained from the drainused and thereis no back pressure.
•
Check the operating gas pressure by means of amonometric group to check the water supply
pressure.
First start-up cycle
When the unitis first powered up, itwillperform an initial start-up cycle.
The start-up cycleincludes first an alignment of the expansion valve (whereapplicable). Then a complete
opening and closing of the water flow control valve. Thisallowsany air in the unit to be purged.
The cycle takes approximately 2 minutes.
After thiscycle the unitis ready for operation.
CAUTION: In the event of a blackout or other power failure, the unitwillrun a start-up cycleagainwhen
power isrestored.