2.
Drill the holesusing a drill (holes with a diametercorresponding to the section of the fixing dowels.5)
3.
Insert the anchor plugs, suitable for the type of ceiling and the weight of the unit, into the
drilledholes and secure them by hittingthem with a hammer.
4.
Attach the threadedrods to the pins of the anchor bolts.
5.
Insert the fixing nuts into the threadedrods.
6.
Pass the threadedrods over the fixing brackets on the four corners of the unit and secure them with
the adjustment nuts after inserting the vibrationdampers.
7.
Adjust the 4 anchor points so that the unitisperfectlyhorizontal. Use a spiritlevel to ensurecorrect
positioning.
4. ELECTRICAL CONNECTION
Beforeanyintervention, disconnect the power supply to the air conditioner.
In addition the wiringdiagrams aresubject to continuousupdating and ismandatoryrefer tothose on the
machine.
If the unitisnotpositionedhorizontally, condensationmaynot drain properlythrough
the outlets provided, potentiallydamaging the unit or surroundingobjects.
Work on the unit's power supply must always be carried out by experienced and
qualifiedpersonnel.