BA_ECO-Cube_190815_EN.docx
10
15.08.2019
5.1 Installation of the system
The “ECO-Cube” filter system is delivered as a modular kit in separate system parts. These are as-
sembled on site. The following should be noted:
•
The final position of the filter system is determined with the setting up of the dust collector hous-
ing (pos. 5).The front side of the dust collecting housing is the one from which the dust collec-
tion container can be removed. The front side must later concord with the front of the filter hous-
ing (pos. 3) and the cleaning device (pos. 2).Note the representation in Chapter 1, "Description
of the system elements."
The cross braces (pos. 22) can be used to transport the unit to the final destina-
tion after the final assembly by means of a lifting implement (e.g. load platform).
This can make sense when e.g. the final destination is not suitable for an assembly.
But when the cross braces are used, it may only be transported a short dis-
tance. The unit can only be slightly lifted. Be careful - danger of tipping over!
•
Before attaching the filter housing it must be checked that the seal in the dust collector housing
("A") is clean fitted all round. The lifting eyes ("B") must be used to attach the filter housing.
•
In conclusion, the housing units must be connected by closing the toggle lever (“G”).These are
supplied unassembled and must be assembled on site. These are to be screwed onto the filter
housing of the locking hook ("E") and the dust collector housing of the toggle lever (”G”). The
assembly of the toggle catches and closing hooks occurs with screws M6x12. The toggle clo-
sures finally have to be secured against accidental opening with safety screws M8x16 ("H") and
matching nuts and washers.
•
Before attaching the cleaning device housing it must be checked that the seal in the filter hous-
ing ("C") is clean fitted all round. The lifting eyes ("D") of the fan must be used to attach the
cleaning device housing.
The crane openings ("D") may only be used for lifting the cleaning housing.
The crane openings are not suitable to lift the weight of the entire ECO-Cube-
system.
•
In conclusion, the housing units must be connected by closing the toggle lever (“G”).These are
supplied unassembled and must be assembled on site. These are to be screwed onto the
cleaning device housing of the locking hook ("E") and the filter housing of the toggle lever (”G”).
The assembly of the toggle catches and closing hooks occurs with screws M6x12. The toggle
closures finally have to be secured against accidental opening with safety screws M8x16 ("H")
and matching nuts and washers.
•
A measuring tube must be connected now. The measuring tube is located in the dedusting
housing (pos.2). The loose end of the measuring tube must be attached to the bulkhead con-
nection ("F") of the filter housing. Therefore loosen the threaded nut, throw it over the measuring
tube, pull the measuring tube on the bulkhead connection, and screw the threaded nut back on
the bulkhead connection.
•
The service door (pos. 16) must be mounted on the dedusting housing. The mounting is effect-
ed using screws M6x12 and corresponding full face gaskets.
•
The spark Labyrinth with suction supports (pos. 9) must be mounted on the required side – left
or right - of the filter housing. Assembly is with screws M6x12 and sealing shims.
On the opposite side the opening has to be closed by mounting the cover plate (pos.15).
•
The curved silencer (pos. 10) must be mounted to the vent opening of the fan. Therefore the
curved silencer must be hung in the upper edging of the fan so that the 2 holes ("J") are posi-
tioned over the thread openings. Screw the curved silencer on these 2 holes with screws
M8x20.
•
The step ladder is equipped with a steel cable. This must be fixed with carabiner („L“) at the
eyelet („K“) of the dust collector housing (pos.5).
•
On the back of the filter housing 2 mounting brackets for supply lines ("M") have to be mounted,