83
After installation is completed, provide the following performance data:
1.
Location of test:
Date of test:
Power supply during test operation (voltage, frequency, phase):
Clockwise rotation of Macerating pump checked:
YES
NO
Clockwise rotation of Sea Water Pump checked:
YES
NO
Open/Close of Solenoid valve (seawater inlet device, if supplied) checked:
YES
NO
Pressure regulator valve at seawater line (if supplied) checked (calibrated at approx. 1 Bar):
YES
NO
Clockwise rotation of filling pump 1 checked:
YES
NO
Complete priming of the filling pump 1 checked:
YES
NO
(if present) Clockwise rotation of filling pump 2 checked:
YES
NO
(in present) Complete priming of the filling pump 2 checked:
YES
NO
Complete priming of the H
2
O
2
dosing pump and check settings:
YES
NO
Complete priming of the ECOFLOC
dosing pump and check settings:
YES
NO
Complete opening of “sludge discharge valve (V2)” checked:
YES
NO
Activation pressure switch (only on PP version)
(check pressure activation as per commissioning certificate)
YES
NO
Set correctly the “discharge time” (emptying the treatment tank):
YES
NO
Set correctly the “sludge discharge time” (emptying the treatment tank):
YES
NO
Max Power consumption (kW):