46
Machine operation with servofreezer
As illustrated in the drawing below, the
servofreezer (3)
is generally located behind the machine,
raised from the ground. The pump
(2)
which supplies the servofreezer must be placed near the
mixture storage tank, which in turn may be as far as 15 metres away from the freezer.
The piping that connects the servofreezer
(3)
to pump
(2)
must be made of rubber or plastic. We
strongly advise not to use metallic piping.
In case
Technogel S.p.a.
has supplied only the servofreezer and that the Client must install the
pump, we recommend installing a
centrifugal
pump with a maximum head of
10 metres (thrust
pressure).
In case the storage tank is positioned above the freezer (for example, on the floor above), just
connect the tank outlet directly to the servofreezer, without the aid of a pump.
Summary of Contents for FREEZER 200/1
Page 28: ...28 Electric system ...
Page 29: ...29 Electric system ...
Page 30: ...30 Electric system ...
Page 31: ...31 Electric system ...
Page 32: ...32 Electric system ...
Page 33: ...33 Electric system ...
Page 36: ...36 Pump variator assembly with connecting rod ...