GB
17
• By calling the telephone line on which the
TYPHONE
is recorded, the user can:
- know the ambient temperature of zone 1,
- know the setpoint temperature of the current mode of zone 1,
- send an override setpoint.
In case of setpoint modification, zone 1 and possible zone 2 operates in “COMFORT” mode.
This override is indicated by an index on the LCD.
Any action on the rotary knob deactivates the override and extinguishes the indicator.
• Parameters possibilities:
- access code change (parameter 62),
- interface language change - French / English (parameter 61).
8.10 - POWER FAILURE
• In case of power failure, the parameters and settings are maintained. If the power outage exceeds 6 hours, the time setting
will have to be corrected.
8.11 - MISCELLANEOUS
• Mode changes using the rotary knob (
Heating / Cooling
(not used)
/ Anti-freeze / Stop
) are delayed 10 seconds in order to
filter inappropriate actions. However, the "
Time Setting
" and "
Hourly Programming
" positions do not have the time delay
feature.
• The authorization thresholds on the water temperature are cut-off values with a differential of 1K for the reset.
9.1 - STARTING
9.1.1 - PRELIMINARY CHECKS
Check:
• Ensure that the hydraulic connections are properly tight and that the hydraulic system operates correctly:
- purge of circuits, valve position, hydraulic pressure (1.5 to 3 bar).
• For leaks.
• Electrical cables and wires are well secured to their connection terminals. Loose terminals can cause heat build-up on
the terminal board and malfunctions.
• Ensure that the electric cables are properly protected from all sheet metal edges or metal parts that could damage them.
• Ensure that control cables and power cables are properly separated.
• Check that the unit is properly grounded.
• For tools or foreign objects in the units and control box.
• The correct installation of the heat pump and boiler. These elements must be ready to operate. Refer to the
corresponding manuals.
9.1.2 - CONTROL PARAMETERISATION
• Parameterisation is performed on the control box.
• Set the button on the installation's control box to “
OFF
”.
• Check the parameterisation and, if required, adapt it to the type of application and according to the installation conditions
(see paragraph 8.7).
9.1.3 - ADDITIONAL CHECKS
• With the control box button on “
OFF
”, turn installation power on.
• Force operation of the installation's circulating pump.
• Make sure that the generator's circulator is operating and adjust the water output as required (with the control valve).
• Check that water is properly circulating in the installation (valve position).
• Make sure to purge the circuits and check the hydraulic pressure.
• Make sure that the generator has started in the desired mode.
• Make sure that the supplementary valve is operating, possibly by forcing the opening.
• Check the generator and boiler setpoints.
• Check the indications of the temperature sensors; perform an “
Offset
” calibration of these sensors if required.
.
9 - STARTING - MAINTENANCE
Before doing any work on the installation, make sure it is switched off and all power supplies locked out.
Any work must be carried out by personnel qualified and authorised to work on this type of machine.
IMPORTANT NOTE
Summary of Contents for K 60 D 066 Z
Page 19: ...GB 19...
Page 20: ...F GB D I E...
Page 21: ...F GB D I E...
Page 22: ...F GB D I E 1918...
Page 23: ...F GB D I E...